BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2023 at 7:00 PM

Updated January 26, 2024

Site work for a playground / park / athletic field in Springfield, Nebraska. Completed plans call for site work for a playground / park / athletic field.

Garden Oaks SID 313, Sarpy County - 2023 Park Improvements - The work to be performed in this improvement shall consist of grading, installing, sidewalks, trails, rubber surfacing, park benches, trash receptacles, 5-10 year old play structure, 2-5 year old play structure, 6-23 month play structure, swing sets, comet spinner, kidforce spinner, reinforced concrete pipe, reinforced concrete flared-end sections, 60" manhole, flexamat plus, trees, round rail fence, curb ramps, French drains, seeding and matting, together with any and all necessary appurtenances and other work that is incidental and necessary for a completed improvement located in the south westerly area of Outlot A within SID 313, Garden Oaks. 4' X 5" Concrete Sidewalk W/ Subgrade Prep & 1 Backfill 5' X 5" Concrete Sidewalk W/ Subgrade Prep & 2 Backfill 6' X 6" Concrete Sidewalk VW Subgrade Prep & 3 Backfill 6' X 6" Concrete Sidewalk VW Subgrade Prep & 4 Backfill (Northeast Connection) 5 8" Concrete Playground Curb 6 Thickened Edge at Playground Sidewalk 7 Rubber Surfacing VW Concrete Base 8 36' Hexagon Picnic Shelter 9 6' Park Bench 10 Trash Receptacle 11 8'Picnic Table 12 8'Ada Picnic Table 13 5-12 Yr Olds Play Structure 14 2-5 Yr Olds Play Structure 15 6-23 Month Olds Play Structure 16 2 Bay Swing Set VW 2 Belt Swings & 1 Tot Swing 17 Konnection Swing Seat Swing & Bay Extension 18 Inclusive Swing Seat 19 Oodle Swing 20 Comet Spinner 21 Kidforce Spinner 22 Sand Surfacing 23 4" Perforated Drain Pipe 24 6" Solid Drain Pipe 25 Park Tree 26 Seed All Disturbed Areas - Type A Mat All Disturbed/Seeded Areas - North American 27 Green 28 Site Grading 29 Electrical Hook-Up (Light & Outlet In Shelter) 30 Security Cameras & Signage 31 Dog WasteStations 32 Bike Rack 33 Park Sign 34 Round Rail Fence 35 Construct Silt Fence 36 Install Construction Entrance The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, and miscellaneous costs) is $907,000.00. Contractor shall furnish Performance, Payment and Guarantee Bond in an amount at least equal to one hundred percent of the contract price

Award

Playgrounds / Parks / Athletic Fields

$895,637.00

Public - County

Site Work

13

9

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
91
Bidding Soon
968
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 11, 2023

February 10, 2023

Project location map

Multiple Locations, Springfield, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.