BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Sulphur, Louisiana. Completed plans call for site work for a water / sewer project.

Each bid shall include a proposal guaranty in an amount not less than specified above. The contract will be awarded to the lowest responsible bidder without discrimination on grounds of race, color, sex or national origin. Disadvantaged businesses will be afforded full opportunity to submit bids. PROPOSAL GUARANTY: 5% The Offerors or Bidders attention is called to the Equal Opportunity Clause and the Standard Federal Equal Employment Opportunity Construction Contract Specifications set forth herein. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractors aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables participation for each trade Goals for minority 19.3% Goals for female participation for each trade 6.9% These goals are applicable to all the Contractors construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractors compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60- 4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractors goals shall be a violation of the contract, the Executive Order, and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. As used in this Notice, and in the contract resulting from this solicitation, the covered area is State of County of City of: Louisiana Calcasieu Sulphur FEDERAL PARTICIPATION: This project will be partially funded with federal funds for the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal Laws & Regulations associated with that program. Refer to EDA Contracting Provisions for Construction Projects in the Supplemental Specifications. The award of a contract, if awarded, will be made to the lowest qualified bidder whose proposal complies with all requirements prescribed within 45 calendar days after opening proposals. However, when the contract is to be financed by bonds which are required to be sold after receipts of bids, or when the contract is to be financed in whole or part by federal or other funds not available at the time bids are received, the time will not start until receipt of federal and/or state concurrence or concurrence of the other funding source. Award will be within 30 calendar days after the sale of bonds or receipt of concurrence in award from federal and/or state agency or other funding source. The successful bidder will be notified by letter mailed to the address shown in the proposal that the bidder is awarded the contract. The award of a contract for projects financed either partially or entirely with State bonds will be contingent on approval by the State Bond Commission. On projects involving federal funds the award of contract will also be contingent upon concurrence by the appropriate federal agency. On projects involving state funds the award of contract will also be contingent upon concurrence by the appropriate state agency. The right is reserved to reject bids and waive informalities.

Bid Results

Water / Sewer

$4,888,535.00

Public - County

Site Work

19

48

8

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
23
Bidding Soon
259
All Active Projects
131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

April 3, 2023

img_map_placeholder

To Be Determined, Sulphur, LA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.