Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Sulphur, Louisiana. Completed plans call for site work for a water / sewer project.
Each bid shall include a proposal guaranty in an amount not less than specified above. The contract will be awarded to the lowest responsible bidder without discrimination on grounds of race, color, sex or national origin. Disadvantaged businesses will be afforded full opportunity to submit bids. PROPOSAL GUARANTY: 5% The Offerors or Bidders attention is called to the Equal Opportunity Clause and the Standard Federal Equal Employment Opportunity Construction Contract Specifications set forth herein. The goals and timetables for minority and female participation, expressed in percentage terms for the Contractors aggregate workforce in each trade on all construction work in the covered area, are as follows: Timetables participation for each trade Goals for minority 19.3% Goals for female participation for each trade 6.9% These goals are applicable to all the Contractors construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the contractor also is subject to the goals for both its federally involved and non-federally involved construction. The Contractors compliance with the Executive Order and the regulations in 41 CFR Part 60-4 shall be based on its implementation of the Equal Opportunity Clause, specific affirmative action obligations required by the specifications set forth in 41 CFR 60- 4.3(a), and its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade and the contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractors goals shall be a violation of the contract, the Executive Order, and the regulations in 41 CFR Part 60-4. Compliance with the goals will be measured against the total work hours performed. The Contractor shall provide written notification to the Director of the Office of Federal Contract Compliance Programs within 10 working days of award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the name, address and telephone number of the subcontractor; employer identification number of the subcontractor; estimated dollar amount of the subcontract; estimated starting and completion dates of the subcontract; and the geographical area in which the subcontract is to be performed. As used in this Notice, and in the contract resulting from this solicitation, the covered area is State of County of City of: Louisiana Calcasieu Sulphur FEDERAL PARTICIPATION: This project will be partially funded with federal funds for the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal Laws & Regulations associated with that program. Refer to EDA Contracting Provisions for Construction Projects in the Supplemental Specifications. The award of a contract, if awarded, will be made to the lowest qualified bidder whose proposal complies with all requirements prescribed within 45 calendar days after opening proposals. However, when the contract is to be financed by bonds which are required to be sold after receipts of bids, or when the contract is to be financed in whole or part by federal or other funds not available at the time bids are received, the time will not start until receipt of federal and/or state concurrence or concurrence of the other funding source. Award will be within 30 calendar days after the sale of bonds or receipt of concurrence in award from federal and/or state agency or other funding source. The successful bidder will be notified by letter mailed to the address shown in the proposal that the bidder is awarded the contract. The award of a contract for projects financed either partially or entirely with State bonds will be contingent on approval by the State Bond Commission. On projects involving federal funds the award of contract will also be contingent upon concurrence by the appropriate federal agency. On projects involving state funds the award of contract will also be contingent upon concurrence by the appropriate state agency. The right is reserved to reject bids and waive informalities.
Bid Results
Water / Sewer
$4,888,535.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 31, 2023
April 3, 2023
To Be Determined, Sulphur, LA
Related To This Project
Sulphur, LA
--
Sulphur, LA
Bid Date: Jan 04 2022
Sulphur, LA
Bid Date: Mar 07 2023
Sulphur, LA
Bid Date: Mar 28 2023
Sulphur, LA
Bid Date: Mar 22 2023
Sulphur, LA
Bid Date: Apr 18 2023
Sulphur, LA
Bid Date: May 04 2023
Sulphur, LA
Bid Date: Jan 19 2023
Sulphur, LA
Bid Date: Apr 12 2023
Sulphur, LA
Bid Date: Nov 08 2023
Sulphur, LA
Bid Date: Sep 23 2022
Sulphur, LA
Bid Date: Sep 14 2022
Sulphur, LA
Bid Date: Apr 01 2021
Sulphur, LA
Bid Date: Aug 31 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.