BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work, paving and renovation of a mixed-use development in Smithville, Texas. Completed plans call for the renovation of a transportation facility; for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project is a renovation of the existing CARTS Smithville Station located at 300 NE Loop 230 in Smithville, Texas 78957. The project includes both sitework and building renovations. Sitework Renovation Includes: • Demolition of an existing pre-engineered metal building and its concrete foundation • Removal of existing asphalt paving and new replacement asphalt & concrete paving • New site lighting poles • Renovation of existing lighted monument sign Station Building Renovation Includes: • Replacement of roofing, wall siding, soffits, window and doors • New interior finishes and doors throughout • New millwork in selected rooms; refinished millwork in other rooms • Repair of interior water damage from roof and wall leaks • Replacement of HVAC, upgraded electrical and plumbing work throughout Bid Bond. A Bid Bond is required in the amount of 5% of the total proposed price and in the form of a certified or cashier’s check or a bid bond issued by a surety licensed to do business in the state of Texas as a guarantee that the successful Offeror will enter into a proper contract and execute bonds and guaranties on the forms provided within ten (10) days after the date contract documents are received by the contractor Deadline for Proposal Questions Tuesday, August 27, 2024, 10:00 AM Time of Functional Completion: The undersigned Contractor agrees to commence work within 7 days after Notice to Proceed is issued. The Contractor agrees to complete construction of the project as required by the RFP, Project Manual, Drawings and Addenda for the CARTS Smithville Station Renovation in 270 calendar days. CARTS reserves the right to reject any and all proposals, to accept proposals in whole or in part, and to waive irregularities or formalities in the proposal

Post-Bid

Sidewalks / Parking Lot

$1,000,000.00

Public - County

Paving, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
50
Bidding Soon
2,055
All Active Projects
696
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 10, 2024

img_map_placeholder

300 NE Loop 230, Smithville, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.