EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 26, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Casey, Illinois. Completed plans call for the renovation of a educational facility.

Work shall include the removal of existing steam and condensate piping, finned tube assemblies and installation of a new vertical unit ventilators, new condenser units, new hot water distribution piping and pumps, new BAS controls and an alternate bid new hot water boiler along with other miscellaneous associated work including electrical work at Monroe Elementary School located in Casey, Illinois. All work shall be bid under one prime contract. All bidders shall submit and enclose with their bid signed certifications that the contractor is not barred from bidding on the contract as a result of a violation of either Section 33E-3 or 33E-4 of Article 33E, Public Act 85-1295 (Senate Bill 2002) effective January 1, 1989. Certification must be submitted on the form furnished in the Project Manual. Each bid shall be accompanied by a bid deposit in the form of a certified check or bid bond in the amount of 5% of the base bid, payable to the Casey-Westfield Community Unit School District No. C-4, Casey, Illinois. A Performance Bond and Payment Bond will be required of the bidder(s) to whom a contract is awarded. If any person contemplating submitting a bid for proposed contract is in doubt as to the true meaning of any part of the plans, specifications, or other proposed contract documents, he may submit to the A/E a written request for the interpretation thereof. The Contractor shall not submit a request after 72 hours before bid opening. Any interpretation of the proposed documents will be made only by Addendum duly issued and a copy of such Addendum will be conveyed electronically (emailed or faxed) to each person receiving a set of documents. The A/E will not be responsible for any other explanation of interpretation of the proposed documents. All Prime Contractors requesting Bid Documents sent to them, will be shipped via UPS Ground and the contractor shall remit a separate check (non-refundable) made payable to the A/E in the amount of $25.00 per set for shipping and handling. Material suppliers may purchase copies of the drawings and specifications at a cost of $7.00 per sheet of drawings and 40c per page of specifications, non-refundable. Contractors submitting proposals shall complete them in accordance with schedule in Instructions to Bidders. When the word Owner occurs in the Contract Documents, it shall apply to the Board of Education, Casey-Westfield Community Unit School District No. C-4, Casey, Illinois, or its authorized representative. When the word Contractor occurs, it shall apply to any firm or individual having a direct contract with the Owner. When the word Subcontractor occurs, it shall apply to any firm or individual having a direct contract with the Contractor. All bidders are advised that the law concerning prevailing wage rates shall comply with all requirements of the Illinois Prevailing Wage Act. The latest published prevailing wage rates have been included within the Project Manual along with stipulations on updates by the Office of the State of Illinois, Department of Labor, telephone 217/782-6206. No bid may be withdrawn for 60 days after date of opening of bids and the Owner reserves the right to waive any and all informality on bidding and the right to reject any or all bids or any part thereof and to accept the bid or bids being most favorable to the Owner after all bids have been examined and evaluated. The Owner's waiver of any breach or failure to enforce any of the terms and conditions of the Advertisement for Bids or Instructions to Bidders, shall not in any way affect, limit, or waive the Owner's right thereafter to enforce and compel strict compliance with every term and condition thereof.

Bid Results

Educational

$612,500.00

Public - City

Renovation

18

11

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceilings, Acoustical Ceilings
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
32
Bidding Soon
306
All Active Projects
175
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2023

June 5, 2023

img_map_placeholder

301 E Monroe Ave, Casey, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

HVAC Upgrades at Monroe Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.