Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Flovilla, Georgia. Completed plans call for site work for a water / sewer project.
SCOPE OF WORK This project shall include furnishing all products and equipment and performing all labor necessary to construct the following: installation of approximately 6,100 L.F. of 6" PVC Water Main, approximately 150 L.F. of Jack & Bore Steel casing to be bored under Northfolk Southern Right-Of-Way, installation of new fire hydrants, water service transfers, abandonment of existing water mains and all other appurtenances necessary to complete the project in accordance with the specifications and construction drawings. This project will be awarded in one (1) contract. Time allotted for completion of work is _180_consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract CONTRACTOR LICENSE The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A 43-14-2(17) so the Contractor performing the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must also employ a "Utility Manager" certification holder who will have oversight of all the utility work. Therefore, the Contractor submitting a bid must list the license number of the Contractor BONDS Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. PERMITS The status of Federal, State, and /or Local permits for this project are as follows: PERMITS/AGENCIEs STATUS A. Land Disturbance Permit Not Required B. NPDES GAR 100002 (Stormwater) Not Required C. GA Environmental Protection Division Submitted D. Georgia Department of Transportation Not Required E. Norfolk Southern Not Yet Submitted EASEMENTS & RIGHTS-OF-WAY All easements and rights-of-way for permanent installations have been obtained or will be obtained by the Owner prior to issuing the Notice to Proceed. GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT All qualifying Contractors and Subcontractors performing work with the City of Flovilla must register and participate in the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, to verify the work eligibility information of new employees. In order for a Bid to be considered, it is mandatory that the Bidder's Affidavit of Compliance with O.C.G.A. 13-10-91 be completed and submitted with the Bid. 1.9 FUNDING SOURCES Section 3 Covered Contract: This project is covered under the requirements of the Section 3 of the HUD Act of 1968. This contract opportunity is a Section 3 Covered Contract. Section 3 Business Concerns are encouraged to apply. If a bidder wishes to claim Section 3 preference, properly signed Section 3 documents MUST be submitted with the bid All Bidders must comply with 41 CFR 60-4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60-4, as applicable to the area of the project. Bidders must also comply with OCGA-13-10-91 and utilize the federal work authorization program commonly known at E-Verify. Wage Rates: Attention of BIDDERS is particularly called to the requirements regarding as to conditions of employment to be observed and wage rates to be paid under the contract documents on this project must be paid as per the WAGE RATES in the CDBG Contract Clauses indicated in the Contract Documents on this project, and that the contractor, subcontractor, must also comply with all Federal, State, and local requirements. Minority and female owned firms are encouraged to participate in the Federally funded project. Procurement will be in compliance with the Common Rule, 24 CFR 84.36. Potential respondents are particularly called to the requirements of Title VI; of Civil Rights Act of 1964 and CFR 570.602; and Executive Order 11246 - Equal Employment Opportunity and Affirmative Action. The work to be performed under this contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 U.S.C. 1701 u (Section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall to greatest extent feasible, be directed to Section 3 residents and businesses in the area especially low- and very low income persons, particularly persons who are recipients of HUD assistance for housing. Neither the United States nor any of the departments, agencies, or employees is or will be a party of any contract awarded to this Invitation to Bid. 1.10 RESERVATION OF RIGHTS Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.
Post-Bid
Water / Sewer
$2,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2023
April 4, 2023
Multiple Locations, Flovilla, GA
Related To This Project
Flovilla, GA
Bid Date: Apr 18 2023
Athens, GA
--
Reidsville, GA
--
Valdosta, GA
Bid Date: Feb 07 2023
Augusta, GA
--
Reidsville, GA
Bid Date: Jan 31 2023
Savannah, GA
Bid Date: Jan 24 2023
Bainbridge, GA
Bid Date: Jan 19 2023
Macon, GA
Bid Date: Jan 23 2023
Atlanta, GA
--
Newnan, GA
Bid Date: Jan 18 2023
Ochlocknee, GA
Bid Date: Jan 27 2023
Evans, GA
Bid Date: Feb 02 2023
Dalton, GA
Bid Date: Jan 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.