BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Eaton, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

Region: 4 Counties: Weld Projects: FSA0853-123 Workdays: 53 UDBE Goal: 0.00% Install median northbound and southbound left-turn acceleration lanes along US85 at the intersection of WCR66. Remove and extend an existing culvert below both directions of US85. Backfill an existing culvert below southbound US85. Install a new culvert below southbound US85 It is estimated that the total cost of all items in the bid will be: ( ) Between $0 and $1,000,000 (X) Between $1,000,000 and $5,000,000 ( ) Between $5,000,000 and $20,000,000 ( ) Greater than $20,000,000 CODOT - 001 - Install Median Northbound and Southbound Left-turn Acceleration Lanes Along US85 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$1,223,303.00

Public - State/Provincial

Paving, Site Work

121

3

2

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
105
Bidding Soon
1,531
All Active Projects
651
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 26, 2023

April 17, 2023

June 30, 2023

img_map_placeholder

US-85, Eaton, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.