BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 20, 2023 at 7:00 PM

Updated September 15, 2023

Site work for a bridge / tunnel in Center, North Dakota. Completed plans call for site work for a bridge / tunnel.

Online Bidding: Available Description: The Project includes the following Work: Addition of two HP 10x42 steel piles and a pile caps to the south abutment of an existing bridge. The superstructure consists of nine prestressed channel beams. A small portion of the channel beam will be removed at two locations and HP 10x42 steel piles driven through each hole until a bearing capacity of 78 tons is reached. Pile caps will then be poured around the new piles. Jim Jackson, telephone: 701.751.8360 , jim.jackson@mooreengineeringinc.com, Only questions made in writing by an attachment (PDF) to email or mail may be considered for response by Addenda.

Bid Results

Bridges / Tunnels

$162,690.00

Public - County

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
8
Bidding Soon
123
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

February 20, 2023

Project location map

Multiple Locations, Center, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.