Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 9, 2026 at 8:00 PM
Updated May 16, 2026
Demolition and site work for a clubhouse / community center in Cumming, Georgia. Completed plans call for the demolition of a 11,500-square-foot clubhouse / community center; and for site work for a clubhouse / community center.
Requirements: Contractor shall provide all labor, materials, equipment, and supervision necessary to demolish and remove all structures, foundations, footings, slabs, interior fencing, and associated improvements within the designated demolition limits as shown on site plans or as field-verified with the Owner prior to commencement. No assumptions shall be made regarding scope. Contractor is responsible for field verification of all existing conditions. Photo provided herein is for general reference only;the markings do not represent the precise limits of the work area 1. Structures Included in Demolition o Stable & Residence - Built 1987 - 4,560 SF o Barn - Built 1987 - 3,978 SF o Canopy - Built 1987 - 1,962 SF o Storage Building 1 - 288 SFo Storage Building 2 - 160 SF o Storage Building 3 - 482 SF o Concrete Slab - Approx. 11,500 SF 2. Items to Remain o Perimeter fencing o Asphalt entry road o Parking areas 3. Contractor General Requirements o Secure the site at all times o Provide barricades, fencing, and signage o Prevent public access to active demolition areas o Maintain safe conditions for adjacent park operations, including active youth soccer areas o Coordinate work to minimize disruption to park operations and shared parking areas o Protect all existing improvements designated to remain o Repair any damage to existing facilities at no cost to the Owner o All work shall be completed within 30 day of Notice to Proceed Polo Fields Equestrian Center Demolition Bid Bond Will not be Required Performance & Payment Bonds Will not be Required (If required due upon award) Questions Due Date: Apr 29th 2026, 2:00 PM EDT
Bid Results
Clubhouse / Community Centers
$55,200.00
Public - County
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
