BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Loveland, Colorado. Completed plans call for site work for a 15,191-square-foot playground / park / athletic field.

The City of Loveland, Colorado ("City") is requesting sealed proposals from qualified vendor/installers or comparable teams for Playground Equipment Design, Procurement and Installation at three locations; Civic Center Park, located on East 4th Street between Loveland Public Library and Chilson Recreation Center, Kirkview Park, located at 2305 Mountain View Drive, and Westside Park, located at 466 West 4th Street Buyer's Requirements General Requirements - Bidder Prequalification/Preregistration Required - Bid Deposit Required - Installation Required - Insurance Required - Material Safety Data Sheets Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Bid Intent Not Available Question Acceptance Deadline 01/25/2023 07:00 PM EST Questions are submitted online No Questions concerning the RFP shall be submitted in writing only to Bethany Clark, Parks & Recreation Planner, at Bethany.Clark@cityofloveland.org . The estimated total budget for purchase and installation of structures and play equipment, excluding EWF blow-in installation, is as follows: Civic Center: $253,000 Kirkview: $88,100 Westside: $77,200 Civic Center Park is located on the City's main Civic Campus of approximately 14-acres. The Civic Campus includes the City's Municipal Building, the Loveland Public Library, the Chilson Recreation Center and Senior Center, and the Foote Lagoon & Amphitheater. The playground is approximately 6,956 +/- SF of level play area surrounded by a concrete curb and surfaced with engineered wood fiber (EWF) and was last replaced in 2011. Civic Center Park is heavily used by the public. The playground, especially, is used by a 9-month preschool program and summer youth day camp program, along with patrons of the Library and Recreation Center. The preschool program is rated a Level 5 Colorado Shines program and undergoes a regular review of its learning and play environment. The Playground must accommodate all age groups and provide a separate play structure for ages 2-5 and for ages 5-12. The two structures should be well separated in the layout as the preschool program cannot allow children on the structure intended for ages 5-12. The Playground equipment and layout should follow the guidelines addressed in the "Playground Information to Use with the Environment Rating Scales", furnished with this RFP packet. Kirkview Park is located in the Kirkview Subdivision in North-Central Loveland, just north of the Loveland Burial Park. Its neighborhood-scale playground largely serves the families of the surrounding neighborhood. The playground includes 3,610 +/- SF of level play area surrounded by a concrete curb and surfaced with engineered wood fiber (EWF). The playground equipment was last replaced in 2010. Westside Park is located at 466 West 4th Street in an established, older residential neighborhood west of downtown Loveland. Westside Park occupies the block bordered by 3rd and 4th Streets between Harrison and Roosevelt Avenues. This neighborhood-scale playground has experienced declining use as the occupants of the homes surrounding the park have aged and their children have grown and left home. The playground includes 4,625 +/- SF of level play area surrounded by a concrete curb and surfaced with engineered wood fiber (EWF). The playground equipment was last replaced in 2010.

Post-Bid

Playgrounds / Parks / Athletic Fields

$418,300.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
40
Bidding Soon
965
All Active Projects
416
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.