BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Houston, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Questions Due Date: Jan 13th 2023, 11:00 AM CST Road Reconstruction at West Gulf Bank Road I-45 to Airline Drive for Harris County Precinct 2 - UPIN#19101MF0XV01 ROAD LOG NO. 2X35402, 2X35403, 2X35401 Located in Harris County Precinct 2, the project proposes to reconstruct the existing twolane asphalt road along West Gulf Bank as a divided boulevard with four 11-foot travel lanes, a 24-foot median, and 8-foot sidewalk along each side. The project is approximately 1.1 miles long and extends from east of the IH-45 Northbound Frontage Road to approximately 300 feet east of Airline Drive. Additional roadway, drainage, and utility improvements to be performed include, but are not limited to, the following: o Temporary traffic control in accordance with the Texas Manual on Uniform Traffic Control Devices. o Implementation of storm water pollution prevention plan. o Clearing and grubbing within the limits of roadway reconstruction and channel regrading from right-of-way line to right-of-way line. o Roadway pavement with curb and driveways consisting of 10-inch thick reinforced concrete pavement and 8-inch thick lime-stabilized subgrade. Asphalt transitions at all asphaltic side streets. o 11-foot turn lanes at various intersections. o Mill and Overlay of approximately 300 feet along West Gulf Bank near eastern limit of project. o Underground storm sewer system along each side of West Gulf Bank primarily consisting of box culverts ranging from 4'x2' to 8'x4'. Inlets, manholes, and junction boxes are also included. o Replacing the P118-27-00 channel crossing with two 10'x8' box culverts, constructing wingwalls with pedestrian rails, and regrading the channel approximately 300 feet. o Traffic signals at three intersections and new curb ramps. o Relocation of City of Houston water line and force main. o Relocation of Sunbelt Freshwater Supply District water line and force main. o Permanent signing and striping in accordance with Harris County Pavement Marking Details and the Texas Manual on Uniform Traffic Control Devices. Refer to construction drawings and specifications for the complete scope of work.

Bid Results

Roads / Highways

$16,973,122.00

Public - County

Paving, Site Work

385

16

12

3

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
77
Bidding Soon
2,757
All Active Projects
972
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.