BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Hastings, Minnesota. Completed plans call for the renovation of a detention facility.

Contractor will furnish all necessary labor, materials, equipment, permits, and supervision for the installation of new Decorative Stone Slurry System flooring in the Dakota County Law Enforcement Center 4100 Housing Unit.Prepare existing flooring and install a Decorative Stone Slurry Flooring System per manufacturers specifications. Prepare existing cove base and install a matching cove base system per manufacturers specifications, at a height of 4 inches. Remove the combination sink/toilet units from all cells, and the desk stools prior to flooring work, then reinstall them after the flooring is completed. Install security caulking around the legs of the bunks and desks, as well as areas where cove base can't be installed (Per Facilities Approval). Contractor will furnish all necessary labor, materials, equipment, permits, and supervision for the installation of new Decorative Stone Slurry System flooring in the Dakota County Law Enforcement Center 4100 Housing Unit. All contractors are strongly encouraged to attend the onsite walk through to ensure a thorough understanding of the Dakota County expectations and contractor responsibilities prior to submitting a quote. Any questions regarding the specifications or conditions found at the site should be directed to: Adam Winn Dakota County Facilities Management Building Maintenance Supervisor 763-227-7782 adam.winn@co.dakota.mn.us Preferred Start date for this project will be February 1st, 2023 Substantial completion of this project will be September 30th, 2023. All work to be completed by December 31st, 2023. Please submit all questions and quotes to Adam Winn in person or at Adam.Winn@co.dakota.mn.us. In submitting this Quotation, it is understood that Dakota County reserves the right to reject any or all Quotations, to waive any informality or irregularity in any Quotation received and to accept any alternate (if applicable) in any order or combination. If awarded the Contract, the undersigned agrees to execute an agreement within the specified time for the above stated compensation.

Post-Bid

Jails / Prisons

$80,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
48
Bidding Soon
826
All Active Projects
355
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2023

February 1, 2023

img_map_placeholder

1580 Hwy 55, Hastings, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.