BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a transportation facility in Chicago, Illinois. Completed plans call for site work for a transportation facility.

Questions Due Date: Jan 25th 2023, 4:00 PM CST Intent to Bid Due Date: Mar 17th 2023, 4:00 PM CDT RFP 114309 Metra Electric District Millennium 4th Track Project - Track and Signal Upgrades Work shall generally be performed at the Consultant's place(s) of business and at various locations within the six county Metra region. Status/coordination meetings may take place at Metra's office at 547 W. Jackson Blvd., Chicago, IL 60661 or virtually. This project shall provide for the upgrading of: A. Modifications at existing Randolph St. Interlocking (MP 0.10). B. Removal of existing intermediate signals (MP 0.62 and MP 0.64). C. A new Metra Interlocking, Monroe St. Interlocking (MP 0.60), and southbound exit intermediate signals directly adjacent to the south of existing Randolph St. Interlocking. D. Removal of the existing intermediate signals (MP 1.10). E. A new Metra interlock Control Point (CP), CP Congress (MP 1.10), and northbound exit intermediate signals located directly adjacent to the north of existing CP 11th Place. F. Modifications at existing CP 11th Place (MP 1.32). G. Modifications to the existing intermediate signal locations (MP 1.54, MP 1.69, MP 1.85) south of existing CP 11th Place.

Post-Bid

Transportation Terminals

$100,000.00

Public - City

Site Work

651

102

9

10

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
123
Bidding Soon
1,800
All Active Projects
801
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 17, 2023

April 17, 2023

img_map_placeholder

151 Michigan Ave, Chicago, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.