BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and renovation of an educational facility in Birmingham, Alabama. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

The original and two (2) flash drives with duplicates of submittals are required for pre-qualification approval; however, email transmission copies may be transmitted to the Project Manager at jeorr@uabmc.edu and cc'd to joey@wba-architects.com to expedite the review process with a hard-copy of the submittal and two flash drives to be delivered within 24 hours. UAB WP2 GME Wellness Center Demolition Package For The University of Alabama at Birmingham Birmingham, Alabama Project No.: H205015 SCOPE OF WORK: The project will consist of select demolition of two existing suites on the 2nd floor of West Pavilion totaling approximately 3,000 sf in advance of a subsequent renovation project. Demolition will include flooring, partitions, ceilings, and mechanical, electrical, and plumbing systems The work will be performed under a single Prime General Contractor who will coordinate the work of this project. The Work will be performed in an occupied hospital, therefore particular and specific care will be required to limit disturbances, coordinate shutdowns, and follow strict Infection Controls and Interim Life Safety Measures (ICRA/ILSM) requirements for the protection of patients, family and staff. Adjacent spaces are sensitive to noise, vibrations, and dust and will require implementation of measures to mitigate these issues. The General Contractor will require experience with similar size and type projects performed in an operating hospital environment and with the implementation and maintenance of infection control measures, interim life safety measures, coordinating shutdowns, and maintaining a clean and organized job site in an operating hospital as a General Contractor (not as a Construction Manager, Program Manager, etc.). The estimated budget is $600,000 and $900,000 PRE-BID CONFERENCE A mandatory Pre-Bid Conference will be scheduled prior to the date set for receipt of bids. It is mandatory that all pre-qualified prime contractor bidders attend the Pre-Bid Conference PRIME CONTRACTOR BIDDER PRE-QUALIFICATIONS: Prime contractor bidders interested in submitting a proposal must apply for pre-qualification and must be licensed under the Provision of Title 34, Chapter 8, and Code of Alabama, 1975. A copy of current Alabama Contractors license is to be included in pre-qualification submittal. Only prime contractor bidders who have completed the pre-qualification process and that have been approved will be eligible to submit a bid for the Project. Prospective Bidder's Pre-qualification Package must be received by the Owner's Project Manager no later than 4:00 PM Central Time, November 3, 2023 after which no further requests will be considered. Pre-qualification Requirements Information Package may be obtained from the Architect upon letterhead request. Any addendums to the prequalification requirements will be issued to documented prime contractors only. The pre-qualification procedure is intended to identify responsible and competent prime contractor bidders relative to the requirements of the Project. Each prospective prime contractor bidder will be notified of the results of the pre-qualification, on or about November 3 , 2023 The Owner reserves the right to waive technical errors in applications, or abandon the pre-qualification process, should the interests of the Owner appear to be promoted thereby. Progress Design and Construction Documents: Prior to the pre-qualification deadline, project progress plans and specifications may be examined at the following location: Architect: Williams Blackstock Architects 2204 1st Avenue South, Suite 200 Birmingham, AL 35233 Joey Tudisco (205) 252-9811 joey@wba-architects.com BIDS BY PRE-QUALIFIED PRIME GENERAL CONTRACTOR BIDDERS Documents: After notice to pre-qualified bidders is given, the pre-qualified prime contractor bidders may obtain bid documents from the Architect (see address above) upon deposit of $100.00 per set. The deposit is refundable in full on the first two (2) sets issued to each prime general contractor bidder upon return of documents in reusable condition within ten (10) days after bid opening. Additional sets for pre-qualified prime contractor bidders, subcontractors, vendors, or dealers may be obtained upon payment of the same deposit. The deposit for additional sets shall be refunded less the cost of printing, reproduction, handling and distribution, upon return of the documents in reusable condition within ten (10) days after bid opening. Bid documents will be available at the following locations after notice to pre-qualified bidders is given. Bonds: A certified check or bid bond payable to the University of Alabama at Birmingham in an amount not less than five percent (5%) of the amount of the bid, but in no event more than $10,000 must accompany the bidder's proposal. Performance and Statutory Labor and Material Payment Bonds will be required at the signing of the Contract. Bids: Bids must be submitted on proposal forms or copies thereof furnished by the Architect. No bid may be withdrawn after the scheduled closing time for receipt of bids for a period of ninety (90) days. The Owner reserves the right to reject bids if such action is determined to be in the best interest of the Owner. The Owner reserves the right to revoke pre-qualification of any bidder in accordance with Section 39-2-12, Code of Alabama, 1975, as amended in 1997 (by Act 97-225). Bids shall be clearly identified on the exterior of the package with the bidder's name, address, State license number, the name of the project being bid, time and place of the bid opening. Sealed bids shall be properly identified. Proposals may be hand delivered or received by mail on the date of the bid opening at the Office of Jeff Orr, Project Manager Facilities and Capital Projects, 2020 Building, 2020 University Blvd, Birmingham, Alabama 35233, until 12:00 noon. After 12:00 noon of the date of the bid opening, proposals must be hand delivered and presented at the bid opening. Sealed proposals shall be submitted in triplicate and shall be properly identified. All proposals received will be returned unopened. Nonresident Prime Contractor Bidders: Under Section 39-3-5, Code of Alabama, 1975, nonresident prime contractor bidders must accompany any written bid documents with a written opinion of an attorney licensed to practice law in such nonresident prime contractor bidder's state of domicile as to the preferences, if any or none, granted by the law of the state to its own business entities whose principal place of business are in that state in the letting of any or all public contracts. Resident prime contractors in Alabama, as defined in Section 39-2-12, are granted preference over nonresident prime contractors in awarding of contracts in the same manner and to the same extent as provided by the laws of the state of domicile of the nonresident. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$900,000.00

Public - State/Provincial

Demolition, Renovation, Site Work

24

19

19

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
33
Bidding Soon
517
All Active Projects
225
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 30, 2023

January 1, 2024

img_map_placeholder

2020 University Blvd, Birmingham, AL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.