BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a civil project in Centreville, Alabama. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; road / highway; road / highway; water / sewer project; water / sewer project; water / sewer project; and water / sewer project.

County : Bibb Constructing the Bridge Replacements (Grading, Drainage, Pavement, and Bridges) on SR-5 over Blue Girth Creek and Blue Girth Creek Relief. Length 0.757 mi. The Bracket Estimate on this project is from $8,428,217 to $10,301,154 . Contract Time: 185 Working Days If further clarification is needed, please contact the Plans and Proposal Section of the Bureau of Office Engineer with any questions you may have. We strongly encourage you to e-mail us at offengr@dot.state.al.us. We will work with you to resolve any issues. The total amount of uncompleted work under contract to a contractor must not exceed the amount of his or her qualification certificate. Minimum Wage Rates have been pre-determined by the Secretary of Labor and are set forth in the advertised specifications. Federal Aid Projects are also subject to the contract work hours and Safety Standards Act and its implementing regulations. Cashier's check or bid bond for 5% of bid (maximum - $50,000.00) made payable to the Alabama Department of Transportation must accompany each bid as evidence of good faith. The Alabama Department of Transportation, proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids. The bidder's proposal must be submitted on the complete original proposal furnished him or her by the Alabama Department of Transportation. The right to reject any or all bids is reserved. ALDOT - Call Order 008 - Bridge Replacements (Grading, Drainage, Pavement, and Bridges) on SR-5 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. For constructing the Bridge Replacements (Grading, Drainage, Pavement, and Bridges) on SR-5 over Blue Girth Creek and Blue Girth Creek Relief. Length 0.757 mi. In the County of BIBB, State of Alabama.

Bid Results

Bridges / Tunnels

$8,357,549.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

212

18

18

6

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
39
Bidding Soon
613
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2023

March 28, 2023

Project location map

State Route 5, Centreville, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.