EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 13, 2023 at 8:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Cherry Valley, New York. Completed plans call for the renovation of a educational facility.

The Cherry Valley-Springfield Central School District invites the submission of Sealed Bid Proposals to furnish materials and labor to complete the Cherry Valley-Springfield Central School District School Based Health Center all in accordance with the plans and specifications. A partial refund of the plan deposit, in an amount equal to the full amount of such deposit, less the actual cost of reproduction of the Plans and Specifications shall be made to non-bidders and unsuccessful bidders for the return of all other copies of the Plans and Specifications in good condition within 30 business days following the award of the Contract or the rejection of the bids. Bids shall be prepared as set forth in the Information to Bidders, enclosed in a sealed envelope bearing on its face the name, address and phone number of the bidder and the title of the project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. The Owner further reserves its right to disqualify bidders for any material failure to comply with the Information for Bidders and General, and Special Conditions. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. Each bidder must deposit with his bid, security in the form and subject to the conditions provided in the INFORMATION FOR BIDDERS. Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and to the minimum wage rates to be paid under the Contract. No bidder may withdraw his bid within 45 business days after the date of the opening of bids. Please pay particular attention to the Form of Proposal and it related forms in the project manual. Out-of-State Bidders are required to complete the "Statement Concerning Authority to do Business in the State of New York for non-New York State Companies" located in the Form of Proposal package. There are three sections that must be completed. You must also have the Non-Collusion Certificate completed and signed and if you are a corporation, you must have the Resolution completed and signed. If the Certificate does not accompany the bid, the bid is not valid.

Award

Educational

$264,400.00

Public - City

Renovation

30

24

2

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Membrane Roofing, Modified Bituminous Membrane Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceramic Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Finishes, Wall Coverings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Compartments and Cubicles, Toilet Compartments, Plastic Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Commercial Toilet Accessories, Laundry Accessories, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Casework, Furnishings and Accessories, Bedroom Furnishings, Pillows, Rugs and Mats, Runners, Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Fountains
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Direct-Digital Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Turning Vanes, Air Outlets and Inlets
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of Electrical Systems
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Identification for Electrical Systems, Instrumentation and Control for Electrical Systems, Lighting Control Devices, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Interior Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Grounding and Bonding for Communications Systems, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
104
Bidding Soon
1,255
All Active Projects
582
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

June 26, 2023

img_map_placeholder

597 Co Rd 54, Cherry Valley, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

School Based Health Center at the Main Building - General Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.