BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and new construction of a water / sewer project in Auburn, Washington. Design plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

As of September 5, 2024, a design firm has been selected. This project is anticipated to be funded in part by the United. States Environmental Protection Agency through the Washington State Water Pollution Control Revolving Fund Program (Revolving Fund), and subject to certain federally mandated con-tract provisions In accordance with EP.i-Vs policy on the utilization of socially and. economically disadvantaged individuals and disadvantaged busi-ness enterprises in procurement, where sub consulting opportunities are available the Contractor shall make good faith efforts to ensure to the fullest extent pos-sible that it subcontracts with Minority Business Enterprise (MBE) and Women Business Enterprise (WEE) firms. The applicable MBE/WBE fair share objectives/goals negotiated with EPA by the State of Washington. Office of Minority and Womens Business Enterprises are 10% MBE and 4% WBE. Both MBE and WBE firms must be certified. by the State of Washington Office of Minority and Women's Business Enterprises. King County, in accordance with the provisions of Title VI of the Civil Rights Act. of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all Proposers that it will affirmatively ensure that any contract entered into pursu-ant to this advertisement, dis-advantaged business enterpris-es will be afforded full and fair opportunity to submit proposals in. response to this invitation and will. not be discriminated against on the grounds of race, color, or national origin in consideration for an award. It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for proposals. Prospective proposers can view more details electronically Contact: Debbie Hall, debhall@ kingcounty.gov, 206-263-7873 The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$2,500,000.00

Public - County

Demolition, New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
34
Bidding Soon
666
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2024

img_map_placeholder

To Be Determined, Auburn, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.