Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and new construction of a water / sewer project in Auburn, Washington. Design plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.
As of September 5, 2024, a design firm has been selected. This project is anticipated to be funded in part by the United. States Environmental Protection Agency through the Washington State Water Pollution Control Revolving Fund Program (Revolving Fund), and subject to certain federally mandated con-tract provisions In accordance with EP.i-Vs policy on the utilization of socially and. economically disadvantaged individuals and disadvantaged busi-ness enterprises in procurement, where sub consulting opportunities are available the Contractor shall make good faith efforts to ensure to the fullest extent pos-sible that it subcontracts with Minority Business Enterprise (MBE) and Women Business Enterprise (WEE) firms. The applicable MBE/WBE fair share objectives/goals negotiated with EPA by the State of Washington. Office of Minority and Womens Business Enterprises are 10% MBE and 4% WBE. Both MBE and WBE firms must be certified. by the State of Washington Office of Minority and Women's Business Enterprises. King County, in accordance with the provisions of Title VI of the Civil Rights Act. of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all Proposers that it will affirmatively ensure that any contract entered into pursu-ant to this advertisement, dis-advantaged business enterpris-es will be afforded full and fair opportunity to submit proposals in. response to this invitation and will. not be discriminated against on the grounds of race, color, or national origin in consideration for an award. It is anticipated that this project will be funded in part by the Washington State Department of Ecology. Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any contract or any subcontract resulting from this solicitation for proposals. Prospective proposers can view more details electronically Contact: Debbie Hall, debhall@ kingcounty.gov, 206-263-7873 The method of Contractor Selection has not been Determined at this time.
Design
Water / Sewer
$2,500,000.00
Public - County
Demolition, New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2024
To Be Determined, Auburn, WA
Related To This Project
Auburn, WA
Bid Date: Jan 31 2023
Auburn, WA
--
Auburn, WA
--
Auburn, WA
Bid Date: Dec 17 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.