Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published March 28, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.
This project addresses the need for asset and revenue preservation for multi-vessel use of the west apron at Pier 66. The fender system was originally installed in 1998 with a design life of 15-25 years. Over the years it has experienced deterioration due to heavy use and exposure to the elements. (26) fender panel assemblies will be taken to an off-site facility to be refurbished. Damaged elements such as timber panels, rubber energy absorbers, and steel components will be replaced or rehabilitated. Six foam-filled floating fenders and their attachment hardware will be replaced, as well as all anodes on the steel sleeve elements. This project is planned to be constructed over 2 phases. All in-water work must execute within the permitted work window and outside the commercial Cruise season. Question Deadline 02/03/2023 at 1:30 PM PT To submit questions regarding Bidding Documents, log into VendorConnect This project addresses the need for asset and revenue preservation for multi-vessel use of the west apron at Pier 66. The fender system was originally installed in 1998 with a design life of 15-25 years. Over the years it has experienced deterioration due to heavy use and exposure to the elements. (26) fender panel assemblies will be taken to an off-site facility to be refurbished. Damaged elements such as timber panels, rubber energy absorbers, and steel components will be replaced or rehabilitated. Six foam-filled floating fenders and their attachment hardware will be replaced, as well as all anodes on the steel sleeve elements. This project is planned to be constructed over 2 phases. All in-water work must execute within the permitted work window and outside the commercial Cruise season. The Engineers estimate range for this project is $4,000,000 - $8,000,000. The WMBE utilization goal is 7% for this contract.
Award
Water / Sewer
$5,214,300.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 16, 2023
November 16, 2023
2225 Alaskan Way, Seattle, WA
Related To This Project
Seattle, WA
Bid Date: Jan 27 2023
Seattle, WA
Bid Date: Feb 01 2023
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Jun 15 2023
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
--
Seattle, WA
Bid Date: Dec 02 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed