Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 28, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.

This project addresses the need for asset and revenue preservation for multi-vessel use of the west apron at Pier 66. The fender system was originally installed in 1998 with a design life of 15-25 years. Over the years it has experienced deterioration due to heavy use and exposure to the elements. (26) fender panel assemblies will be taken to an off-site facility to be refurbished. Damaged elements such as timber panels, rubber energy absorbers, and steel components will be replaced or rehabilitated. Six foam-filled floating fenders and their attachment hardware will be replaced, as well as all anodes on the steel sleeve elements. This project is planned to be constructed over 2 phases. All in-water work must execute within the permitted work window and outside the commercial Cruise season. Question Deadline 02/03/2023 at 1:30 PM PT To submit questions regarding Bidding Documents, log into VendorConnect This project addresses the need for asset and revenue preservation for multi-vessel use of the west apron at Pier 66. The fender system was originally installed in 1998 with a design life of 15-25 years. Over the years it has experienced deterioration due to heavy use and exposure to the elements. (26) fender panel assemblies will be taken to an off-site facility to be refurbished. Damaged elements such as timber panels, rubber energy absorbers, and steel components will be replaced or rehabilitated. Six foam-filled floating fenders and their attachment hardware will be replaced, as well as all anodes on the steel sleeve elements. This project is planned to be constructed over 2 phases. All in-water work must execute within the permitted work window and outside the commercial Cruise season. The Engineers estimate range for this project is $4,000,000 - $8,000,000. The WMBE utilization goal is 7% for this contract.

Award

Water / Sewer

$5,214,300.00

Public - City

Site Work

43

19

27

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
263
Active Projects
116
Bidding Soon
2,088
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed