BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Seattle, Washington. Completed plans call for site work for a water / sewer project.

This project addresses the need for asset and revenue preservation for multi-vessel use of the west apron at Pier 66. The fender system was originally installed in 1998 with a design life of 15-25 years. Over the years it has experienced deterioration due to heavy use and exposure to the elements. (26) fender panel assemblies will be taken to an off-site facility to be refurbished. Damaged elements such as timber panels, rubber energy absorbers, and steel components will be replaced or rehabilitated. Six foam-filled floating fenders and their attachment hardware will be replaced, as well as all anodes on the steel sleeve elements. This project is planned to be constructed over 2 phases. All in-water work must execute within the permitted work window and outside the commercial Cruise season. Question Deadline 02/03/2023 at 1:30 PM PT To submit questions regarding Bidding Documents, log into VendorConnect This project addresses the need for asset and revenue preservation for multi-vessel use of the west apron at Pier 66. The fender system was originally installed in 1998 with a design life of 15-25 years. Over the years it has experienced deterioration due to heavy use and exposure to the elements. (26) fender panel assemblies will be taken to an off-site facility to be refurbished. Damaged elements such as timber panels, rubber energy absorbers, and steel components will be replaced or rehabilitated. Six foam-filled floating fenders and their attachment hardware will be replaced, as well as all anodes on the steel sleeve elements. This project is planned to be constructed over 2 phases. All in-water work must execute within the permitted work window and outside the commercial Cruise season. The Engineers estimate range for this project is $4,000,000 - $8,000,000. The WMBE utilization goal is 7% for this contract.

Award

Water / Sewer

$5,214,300.00

Public - City

Site Work

43

19

27

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
83
Bidding Soon
2,265
All Active Projects
694
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.