Site work and paving for a mixed-use development in Le Mars, Iowa. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Work generally consists of approximately 450 linear feet of water main replacement to include, but not limited to: Grading, Excavation, Subgrade Preparation, and Modified Subbase Storm Sewer, Trenched Removal of Storm Sewer Install Water Main, Trenched Water Main Fittings and Appurtenances Water Service Fire Hydrant Assembly Valve Box Adjustment and Removal Storm Sewer Structures Curb and Gutter Improvements Sidewalk Improvements Full Depth Patches, PCC and HMA Pavement Removal, PCC and HMA Temporary Traffic Control Conventional Seeding, Fertilizing, and Hydro-Mulching Erosion Control Items Remove and Replace Landscaping Remove and Replace Street Signs All proposals shall be made on official proposal forms furnished by the Engineer and shall contain worded and figured prices for the work bid on. Bidder shall submit a Bidder Status Form with their bid. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. A certified check or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked "bid bond". The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution. The checks or bid bonds of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other checks or bid bonds will be returned after the tabulation of bids is completed. Performance and Payment Bonds: The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated Damages: Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. Withdrawal of Bids: No submitted bids may be withdrawn for a period of thirty (30) days from the scheduled closing time for the receipt of bids. Payment: The Contractor will be paid monthly in an amount equal to ninety-five percent (95%) of the Work completed during the previous month according to the Engineer's estimate. The final payment will be made not less than thirty (30) days after completion of the Work and acceptance by the City of Le Mars. No final payment will be due until the Contractor has certified that the materials, labor, and services have been paid for in accordance with the Project Manual. Acceptance or Rejection of Bids: The right to accept or reject any or all bids and to waive informalities is reserved. The work shall be completed as follows: No work shall commence prior to August 1, 2023. All work on the project shall be substantially completed within 35 working days once commenced. All work in Phase 'A' shall be completed within 15 working days once commenced. All work shall be completed by October 13, 2023 regardless of the number of working days used. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. The award of the contract will be made to the lowest responsive, responsible bidder.

Award

Water / Sewer

$259,516.00

Public - City

Paving, Site Work

36

12

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
13
Bidding Soon
219
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2023

August 1, 2023

img_map_placeholder

Plymouth St, Le Mars, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.