Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 31, 2023 at 7:00 PM

Updated January 26, 2024

Site work and renovation of a mixed-use development in Brockton, Massachusetts. Completed plans call for the renovation of a multi-residential development; and for site work for a road / highway.

Project consists of: supplying and installing interior and exterior surveillance cameras, aluminum poles, trenching, conduit, and related equipment at Hillside Village and Roosevelt Heights. Contractor Qualification - DCAMM Certificate As actual damages for any delay in completion are impossible to determine, the Contractor and his sureties shall be liable and shall pay to the Brockton HousingAuthority the sum of $200.00 fixed, agreed, and liquidated damages for each calendar day of delay until the work is completed and accepted.

Bid Results

Multi-Residential

$1,593,148.00

Public - City

Renovation, Site Work

14

7

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
708
Active Projects
312
Bidding Soon
4,952
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed