Site work and paving for a mixed-use development in Chappell Hill, Texas. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; and sidewalk / parking lot.

A. Contractor shall provide all items, articles, materials, operations or methods mentioned or scheduled on the Drawings or herein specified: including all labor, supervision, equipment, incidentals, taxes, and permits necessary to complete the Work as described within the Contract Documents. Contractor shall install all items provided by OWNER as mentioned or scheduled on the Drawings or herein specified. A. Single course asphaltic surface treatment shall include prime, if required, asphalt cement and aggregate. Adjustment to the elevation of manhole frames and covers, valve boxes, and other such utility access structures to match the surface elevation of the new pavement is a part of the pavement operation. A. Double course asphaltic surface treatment shall include prime, if required, asphalt cement and aggregate. Adjustment to the elevation of manhole frames and covers, valve boxes, and other such utility access structures to match the surface elevation of the new pavement is a part of the pavement operation. Work Includes: 1. Quality Assurance-Control of Installation. 2. Tolerances. 3. Manufacturers' Field Services and Reports. A. Work includes providing complete, in-place, all steel required for reinforcement of cast-in-place concrete as shown on the drawings. B. Related Sections and Divisions: Applicable provisions of Division 01 shall govern work in this section. A. Work Included: Excavating, filling, backfilling, and grading for this work includes, but is not necessarily limited to: 1. Excavating needed to perform the work shown on the drawings or specified herein. 2. Furnishing and placing all fill and backfill. 3. Provide compaction of all fill and backfill. 4. Rough and finish grading prior to paving, seeding, etc. B. Related Sections and Divisions: Applicable provisions of Division 01 shall govern work in this section. A. Work Included: 1. Coordination. 2. Field engineering. 3. Progress meetings. Single course chip seal application to approximately 700 linear feet of roadway, cement stabilization and double course chip seal application to approximately 5,425 linear feet of roadway, and bridge repairs consisting of filling void space and construction of approximately 63 linear feet of concrete abutment curb.

Bid Results

Bridges / Tunnels

$288,096.00

Public - County

Paving, Site Work

13

15

2

4

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
118
Active Projects
55
Bidding Soon
2,838
All Active Projects
1,201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2023

February 20, 2023

img_map_placeholder

Old Plantation Rd, Chappell Hill, TX


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.