BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Santa Monica, California. Contact the soliciting agency for additional information.

For Santa Monica UCLA Medical Center B-Level Master Plan Study UCLA requests a written response to this Request for Qualifications (RFQ) to select an Executive Architect for the proposed UCLA Santa Monica Medical Center B-Level Master Plan Study (UCLA Project # 908521.01). UCLA Health proposes selecting an architect to renovate approximately 12,000 SF on B-Level of Merle Norman Pavilion and Central Wing at Santa Monica UCLA Medical Center to reconfigure the vacated space and reassign departments for operational efficiency. The proposed master plan and space program would improve space management for Dialysis Equipment Repair and Cleaning Room, Sterile Processing (SPD), Environmental Services (EVS), Clinical Engineering, Pharmacy, Facilities, and Materials Management departments. Responses to this RFQ should demonstrate familiarity and experience in the design, planning, and construction of administration spaces, SPD equipment replacement, and high-density storage for pharmacy, clinical engineering, materials management, and environmental services, including Department of Public Health requirements (Title 22) and HCAI / OSHPD 1 building. The personnel proposed for this project's assignment must demonstrate experience in these areas. Mechanical, Electrical, Plumbing, and Fire Life-Safety systems analysis of the existing building infrastructure shall be included in the pre-design study phase to ensure the projected design loads can be supported. The project is subject to review and approval by the UC Board of Regents or their delegated authority. This RFQ is for full design services comprising basic architectural services, including schematic design, design development, interiors package, construction documents, cost estimate, LEED, assistance during the bid/award phase, construction administration, record documents, and project closeout for SMUMC B-Level Master Plan Study project; however, the University reserves the right to defer negotiations concerning services other than pre-design studies until the completion of the pre-design phase. The University has not determined a delivery method for this project but may include either CMAR or Design/Bid/Build. The design shall comply with the University of California Policy on Sustainable Practices to achieve a minimum LEED Healthcare Silver Rating. The construction cost for the project has not yet been determined; however, it is anticipated to be between $8-10 million, depending upon the project phasing and the agreed scope of work. The work also may be executed in several incremental projects. The final selection and appointment of the Executive Architect is contingent upon project approval by the University of California Board of Regents or their delegated authority Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within limits imposed by law or University policy. Each Candidate Firm is required to show evidence of its equal employment opportunity policy. A screening committee will determine a shortlist of firms; further steps in the selection process will be at the selection committee's discretion. For questions related to this RFQ, please contact: Larissa Saberin UCLA Health |Planning Design & Construction Project Manager T: (310) 267-1225 E: lsaberin@mednet.ucla.edu The method of contractor selection has not been determined at this time *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Medical

$10,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
99
Bidding Soon
2,193
All Active Projects
977
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

img_map_placeholder

1250 16th St, Santa Monica, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.