BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Carrollton, Georgia. Working plans call for site work for a bridge / tunnel; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of April 4, 2023. The project has been placed on hold indefinitely. They are planning to rebid at some point in the future. For University of West Georgia (UWG) Love Valley Culvert Replacement The project consists of replacing approximately 2,000 LF of existing storm sewer (pipes & structures) where piping is in fair to poor condition around Love Valley on the campus of the University of West Georgia. Portions of the project include storm sewer replacement near the Murphy Building and the University Commons Center. The project will include replacement of the existing failing storm sewer system with primarily high-density polyethylene (HDPE) pipe, some reinforced concrete pipe (RCP), and new storm drainage structures. Construction also includes clearing and grubbing, saw-cutting and demolition of existing pavements as necessary for removal and replacement of the storm sewer, pavement and curb replacement, sidewalk replacement, re-striping where pavement is replaced to match existing striping, installation and removal of temporary construction fencing around project limits, and erosion control (installation, maintenance, and removal), and permanent vegetative stabilization. There are several utility lines within the project area that are critical to UWG's infrastructure, so care must be taken by the contractor to work around those utilities and keeping them active during construction. The contractor will be required to maintain good communication and coordination with Project Engineer, UWG Project Manager, and City Engineer throughout construction of the project.

Final Planning

Bridges / Tunnels

$600,000.00

Public - City

Paving, Site Work

14

7

4

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
45
Bidding Soon
1,343
All Active Projects
480
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2023

September 4, 2023

img_map_placeholder

Multiple Locations, Carrollton, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.