BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2023 at 7:00 PM

Updated January 25, 2024

Site work and paving for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

St. Louis County Project No. AR-1724, Federal Project No. CMAQ-5443(602), consists of the addition of a dedicated right-turn lane and sidewalk on Berry Road from Big Bend Road to Grove Avenue and the extension of a dedicated right-turn lane on Big Bend Boulevard from South Berry Road to Grant Road within St. Louis County and other incidental items necessary to complete the above in a workmanlike manner. The successful Bidder or Bidders shall be required to comply with the most current applicable Federal (Davis-Bacon Act) and State statutory provisions concerning the payment of prevailing wages on public works, Section 290.210 through 290.340 R.S. Mo. 1959, as amended. All contractors must be on the Missouri Department of Transportations approved contractor listing, seven (7) days prior to bid opening. Contractors and sub-contractors who sign a contract to work on a public works project shall provide a ten (10) hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. St. Louis County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. Bids must be accompanied by a certified check or bidder's bond in an amount equal to 5% of the total bid. All checks shall be made payable to Treasurer, St. Louis County. The right is reserved by the St. Louis County to reject any or all bids. The DBE Goal for this project is 16% No 2 nd tier subcontracting will be allowed on this project. Question Deadline: 02/22/2023 at 5:00 PM CT All questions must be submitted via e-mail to the Contract Administrator, Shandrika Combs, SCombs@stlouiscountymo.gov. The work on this project shall commence on the date specified in the "Notice to Proceed" and completed no later than July 26, 2024; unless additional time is granted by the Director. Due to seasonal limitations, sodding and crack sealing may be completed after the dates shown on the schedule, if authorized by the Resident Engineer.

Bid Results

Sidewalks / Parking Lot

$1,160,260.00

Public - County

Paving, Site Work

55

6

5

5

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
98
Bidding Soon
1,227
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2023

March 31, 2023

Project location map

S Berry Rd & Big Bend Rd, Saint Louis, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.