Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a playground / park / athletic field in Boston, Massachusetts. Conceptual plans call for site work for a playground / park / athletic field.
The Boston Parks and Recreation Department, acting through its Commissioner, is requesting designer services, including site analysis, design development plans, construction documents, cost estimates and construction observation for improvements to the following parks: Boston Common - Tadpole Play Lot, Back Bay-beacon Hill Byrne Park, Dorchester Clifford Park, Roxbury Franklin Park - Bear Dens, Roxbury/dorchester Geneva Cliffs, Dorchester Hardiman Playground, Allston-brighton Mt. Hope Cemetery, Roslindale Town Field (Doherty-gibson Playground), Dorchester Walsh Playground, Dorchester Watson Park, South End Professional services shall be completed as stated in the "Request For Qualifications" which also outlines project fees. Applicants must be registered Landscape Architects or Engineers in the Commonwealth of Massachusetts. The attention of all RFQ holders submitting request for qualifications for "Design Consulting Services" is called to the following Addenda to the posted Request for Qualifications. The items set forth herein, whether of omission, addition or substitution are to be included in, and form part of the RFQ for the above named project. Prospective designers for the City of Boston Parks and Recreation Department Project are hereby notified of changes to the Request for Qualifications to be received as advertised. The following clarifications, modifications, deletions and additions are hereby incorporated into and become part of the Request for Qualifications. 1) Clifford Park revised scope and fee Scope: The project scope is for concept design through construction observation (Phases 1-4 of Anticipated Design Process and Scope of Services) of a comprehensive renovation of a 7.66 acre park including play area, dog park, courts, and athletic fields. Basic Fee: $500,000 Supplemental Fee: $50,000 The Method of Contractor Selection has not been determined at this time.
Conceptual
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 12, 2024
Multiple Locations, Boston, MA
Related To This Project
Boston, MA
Bid Date: Jan 25 2023
Boston, MA
Bid Date: Jan 25 2023
Boston, MA
--
Boston, MA
Bid Date: Jan 25 2023
Boston, MA
--
Boston, MA
--
Boston, MA
--
Boston, MA
Bid Date: Jan 25 2023
Boston, MA
Bid Date: Feb 25 2021
Boston, MA
Bid Date: Jan 09 2024
Boston, MA
Bid Date: Apr 21 2022
Boston, MA
Bid Date: Jan 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.