Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published September 4, 2024 at 8:00 PM
Updated September 5, 2024
Site work, paving and outdoor lighting for a mixed-use development in Woods and Lakes, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; for outdoor lighting for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
As of September 4, 2024, an engineer has been selected and this project is in the design phase. Right of way acquisition will be needed for this project and is tentatively scheduled to begin in fall 2025. 428947-1 *The closed solicitation has been included below for reference: Selection Method : Letter of Response and Oral Presentation Financial Management Numbers : 42894713201 SR 40 From Breakaway Trail to Williamson Blvd TRC Members (Subject to Change) : Gabor Chiorean Gary Skofronick Kathleen Enot SR 40 From Breakaway Trail to Williamson Blvd The purpose of this project is to widen SR 40 from four lanes (2-lanes in each direction) to six lanes (three lanes in each direction), stormwater retention and treatment for the roadway widening, and the widening of the exisitng S.R. 40 bridges over the Tomoka River. Rural typical section between Breakaway Trail and Tymber Creek Road. Urban typical section between Tymber Creek Road and I-95. Propose to reduce posted speed from 50 mph to 45 mph from Tymber Creek Road to I-95. Turn lane and signalization improvements at major intersections and in the I-95 interchange area. The project also includes enhancement of pedestrian and bicycle facilities to include a shared use path along the north side. Financial Management Number(s) 428947-1-32-01 Shortlist Selection Date/Time 1/30/2023 Technical Review Committee Meeting 1 Date/Time 2/14/2023 Technical Review Committee Meeting 2 Date/Time 2/14/2023 Technical Review Committee Meeting 3 Date/Time 2/15/2023 Oral Presentation Date/Time 2/15/2023 Final Selection Date/Time 2/27/2023 Negotiations Period Begin Date 3/11/2023 Negotiations Period Ending Date 4/21/2023 FDOT - RFP Engineering - SR 40 From Breakaway Trail to Williamson Blvd The method of contractor selection has not been determined at this time.
Design
Bridges / Tunnels
$37,000,000.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
