Site work for a water / sewer project in Happy Valley, Oregon. Completed plans call for site work for a water / sewer project.

This project generally includes undergrounding overhead utilities along 1470 feet of 129th Avenue and 500 feet of King Road within the City of Happy Valley, Oregon. Construction must be completed no later than Friday, September 1, 2023. Once construction has begun, the contractor must reach substantial completion within 120 days of commencing. The City has the ability to adjust the project schedule due to state mandates. This public works contract is subject to State of Oregon prevailing rates of wage requirements, per ORS 279C.800 through 279C.870. The City will not receive or consider bids unless the bid contains a statement by the bidder that the bidder will comply with ORS 279C.830. Bidders must be qualified in accordance with the applicable parts of ORS279C in order to enter into a contract with the City. No bid shall be considered unless the bidder is registered with the Oregon Construction Contractors. Bidder shall also identify whether bidder is a current resident, as defined in ORS 279A.120. The City of Happy Valley may reject any and all bids that do not comply with prescribed public bidding and contracting procedures and requirements, including the requirement to demonstrate the bidder's responsibility under ORC 279C.375(3)(b), Award and Execution of Contract, and that the City of Happy Valley may reject for good cause any and all bids after finding that doing so is in the public interest. To perform work, bidders must be prequalified with the Oregon Department of Transportation for the class of work defined above Engineer's Estimate: $1.4M to $1.9M Questions relating to the project shall be addressed by email, certified mail or telephone: Sally Curran, P.E., City Engineer, 503 886.8415, (sallyc@happyvalleyor.gov) or Bob Balgos, P.E., Senior Engineer, 503.886.8495, (bbalgos@happyvalleyor.gov)

Award

Water / Sewer

$2,193,168.00

Public - City

Site Work

21

8

5

6

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
28
Bidding Soon
576
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2023

June 22, 2023

img_map_placeholder

SE 129th Ave & SE King Rd, Happy Valley, OR

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.