Site work for a water / sewer project in Lebanon, New Hampshire. Completed plans call for site work for a water / sewer project.

The project consists of installing 6,175 LF of 12-inch DI water main along Mechanic Street extending from the east side of the Terry Dudley Bridge to 220 Mechanic Street (Gardener's Supply Company) and 225 Mechanic Street (Service Credit Union). A new sprinkler service and/or water service will be installed for each existing service connection. The project consists of installing 6,175 LF of 12-inch DI water main along Mechanic Street extending from the east side of the Terry Dudley Bridge to 220 Mechanic Street (Gardener's Supply Company) and 225 Mechanic Street (Service Credit Union) including services, hydrant subs, fittings, valves, and interconnections to the existing system. The project will be constructed in three phases. Phase 1 will include water main installation at the Poverty Lane intersection to allow the Farnum Hill Water Storage Tank to remain in service. Phase 2 will include water main installation from the Poverty Lane intersection to the Terry Dudley Bridge. Phase 3 will include water main installation from the Poverty Lane intersection to 220 Mechanic Street (Gardener's Supply Company) and 225 Mechanic Street (Service Credit Union). The City of Lebanon has pre-purchased the pipe and fittings and the materials are scheduled to be delivered on or before March 31, 2023. The materials will be stored at the Lebanon Wastewater Treatment Plant. The Contractor will be required to pick up the materials as needed for installation. The project also includes an Additive Alternate to construct a sidewalk from Price Chopper to Poverty Lane along the north side of Mechanic Street. Question Submission Deadline:January 20, 2023, 4:00pm Question Response Deadline:January 27, 2023, 11:00am The City requires that the bidders have prior watermain construction experience, and they shall demonstrate with references five similar projects over the last three years. The project also includes an Additive Alternate to construct a sidewalk from Price Chopper to Poverty Lane along the north side of Mechanic Street.

Award

Water / Sewer

$1,733,287.00

Public - City

Site Work

21

27

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
55
Bidding Soon
892
All Active Projects
358
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.