Site work and paving for a road / highway in Wichita, Kansas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

A Bid Bond in the Amount of Five Percent (5%) of the Total Bid or an Annual Bid Bond is Required Prior to Bid Opening. See Section 102.3 of the City of Wichita Standard Specifications for Further Information. Bidders Are Advised to Contact the Office of the City Engineer (316-268- 4501) Should They Have Any Questions or Concerns About the Plans, Special or Supplemental Provisions, Minority Status, or the Proper Preparation of the Bid Document. The work order on this project shall be issued 30 (thirty) calendar days after the date on which the contract for this project has been awarded to the successful bidder. Conflicts with utilities shall not have an effect on the completion date Contractor will be required to schedule a 'Public Information' meeting at least 7 days in advance of construction. Contractor will provide a minimum three-day notice of said meeting's time and location to adjacent residents, property owners and businesses. The Contractor will moderate the meeting and discuss issues such as construction schedules, phasing, traffic control, access to properties and any special considerations regarding the construction and phasing of the project. Key Contractor and City personnel should be in attendance. All work on the project shall be completed in 120 (one-hundred twenty) working days after the issuance of the work order. Working days will be charged as provided for in the Standard Specifications, once the work order is issued. Liquidated damages in the amount of $1,000 per day shall be issued on this project. The non-availability of material shall not prevent working days from being assessed. The Contractor shall read and fully comprehend every aspect of the contract provisions included in this bid proposal, prior to submitting a bid for the project. Any questions prior to bid submittal should be directed to Shawn Mellies, P.E., Project Engineer, at (316) 268-4632 or smellies@wichita.gov. Anticipated project Start Date: March 1, 2023 and Completion Date: March 31, 2024 Reconstruction of 21st Street to provide wider pavement and improved storm water drainage. The design of this project was completed by the owner's in-house design professional.

Bid Results

Roads / Highways

$2,718,722.00

Public - City

Paving, Site Work

94

8

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
13
Bidding Soon
208
All Active Projects
96
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

March 1, 2023

img_map_placeholder

E 21st St N, Wichita, KS


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.