Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 28, 2023 at 7:00 PM
Updated January 26, 2024
Site work and paving for a bridge / tunnel in White Cloud, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge rehabilitation including fascia repairs and scour countermeasures on M-37 over Pere Marquette River and Old US-131 over Paris Creek, Lake and Mecosta Counties. This project includes a 2 year concrete surface coating warranty. Control Sec Job No Federal No M 43011 212527A N/A Net classification required for this project is 620 Fa MI DOT - 2302 005 -Bridge rehabilitation including fascia repairs and scour countermeasures on M-37 over Pere Marquette River and Old US-131 After award, start work on the date approved by the Engineer, which must be no earlier than August 14, 2023. In no case may any work be commenced prior to award by the Department. All contract work on B02-54012 (Old US-131 over Paris Creek) must be complete by August 31, 2023. The entire project must be completed by the final completion date of October 20, 2023.
Award
Bridges / Tunnels
$709,138.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 3, 2023
August 31, 2023
M-37, White Cloud, MI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
