BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Ironwood, Michigan. Completed plans call for site work for a road / highway; and for paving for a road / highway.

1.96 mi of hot mix asphalt cold-in-place recycle and resurfacing and pavement markings on Van Buskirk Road south of Midway Avenue, Gogebic County. This is a Local Agency project. This special provision consists of requirements and restrictions to maintain traffic on Van Buskirk Road in Erwin Township, Gogebic County. The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as ""distribution work,"" starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation. Tunnel, shaft and caisson work of every type and description and all operations incidental thereto, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction. Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation. For all areas except the Upper Peninsula, open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft. of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work. Excavation, site preparation, land balancing, grading, sewers, utilities and improvements; also including but not limited to, tunnels, underground piping, retention, oxidation, flocculation facilities, conduits, general excavation and steel sheeting for underground construction. Underground construction work shall not include any structural modifications, alterations, additions and repairs to buildings or highway work, including roads, streets, bridge construction and parking lots or steel erection. This special provision identifies the price(s) that will be used in all payment adjustments for work related to HMA item(s) used in conjunction with this contract. If the Contractors bid is lower than the established base price any positive adjustment will use the Contractors bid in the calculation for the adjustment. If the Contractors bid is lower than the established base price any negative adjustment will use the base price established herein in the calculation for the adjustment. If the Contractors bid is higher than the established base price any positive adjustment will use the Contractors bid in the calculation for the adjustment. If the Contractors bid is higher than the established base price any negative adjustment will use the Contractors bid in the calculation for the adjustment. This special provision provides sampling and testing requirements for local agency projects using the roller method and the nuclear density gauge testing. Provide the hot mix asphalt (HMA) mixture in accordance with the requirements of the standard specifications, except where modified herein This work consists of cold milling and pulverizing the existing asphalt pavement to the dimensions specified on the plans, processing the reclaimed asphalt pavement (RAP) and mixing with stabilizing asphalt material, water and additives, then paver placing/spreading and compacting the emulsified RAP mixture into a stabilized asphalt base. This work includes sampling and testing existing HMA pavement, following the design for the emulsified RAP mixture and monitoring the end product, and field adjusting the rate of emulsion as needed, performing a rolling pattern test(s) to determine maximum density, and quality control testing to ensure the completed emulsified RAP base layer is consistent with the mix design and compaction requirements specified herein. Perform all work according to the 2020 MDOT standard specifications, except as modified herein. This work shall be done in accordance with the requirements of Division 5 of the 2020 MDOT standard specifications, except as herein specified. This special provision establishes the requirements for dissemination of any public relations communications and/or products intended for an external audience pertaining to this contract. Dissemination must not be made without prior written approval from the Department's Office of Communications, and then only in accordance with explicit instructions by the Department. This includes the use of the Michigan Department of Transportation (MDOT) logo. A violation of this provision may be considered a default of contract and the Department may exercise its rights in accordance with subsection 108.11 of the Standard Specifications for Construction. This work consists of meeting MDOT's construction document management (CDM) system requirements. Submit all project documentation for this contract in electronic format and place it in MDOT's CDM system, unless otherwise noted in this special provision. No paper documents, in printed format (faxes, letters, etc.) are permitted except as allowed by this special provision or specifically approved by the Engineer. The Contractor is responsible for keeping all information in the CDM system up to date throughout the execution of the contract. This work consists of the required use of a prevailing wage and labor compliance (PWLC) system for all prevailing wage documentation as directed by the Engineer. Input all required certified payroll documentation into the PWLC system (LCPtracker) and update this documentation throughout the execution of the contract. Certified payroll information must be submitted in the PWLC system in accordance with the time requirements in the 20SP-107D - Labor Compliance. Ensure all levels of contracting (prime, sub, sub-sub, etc.) comply with all labor compliance requirements in this contract. The Contractor is responsible for subcontractors and lower tier subcontractor labor compliance. Job site poster requirements apply to state and federally funded projects. All Contractors must insert this special provision in each subcontract and further require its inclusion in lower tier subcontracts for federal prevailing wage projects. Contractors are advised that the project area has a known population of the Eastern Massasauga Rattlesnake or is within its known range. This species is listed as federally threatened under the U. S. Endangered Species Act of 1973 (Act). Taking (killing, harming, or disturbing in any manner) of Eastern Massasauga Rattlesnake without a federal permit from the U.S. Fish and Wildlife Service is prohibited under federal law. The Act provides enforcement authority to the U.S. Fish and Wildlife Service and contains severe penalties for violations. The Contractor is liable to the Department for any penalties imposed for violations to the Act due to the Contractor's failure to comply with this special provision. Fines and penalties range up to $50,000 and 1 year in prison. Violation of any requirement listed below can lead to an immediate work stoppage in Eastern Massasauga Rattlesnake habitat. FHWA is required under federal law to assure MDOT is compliant with these provisions or risk losing federal funding for the project. This special provision addresses education, notification and intentional take requirements of the Contractor and their workers to protect the Eastern Massasauga Rattlesnake as required under the Act. For this project, regardless of the application, the use of industrial byproducts covered in 2014 PA 178 is prohibited unless the use and application of a particular material is covered elsewhere in the contract. Control Sec Job No Federal No STL 27000 214914A 23A0137 Net classification required for this project is 776 Cb MI DOT - 2302 011 - Hot Mix Asphalt Cold-in-place Recycle and Resurfacing and Pavement Markings on Van Buskirk Road

Award

Roads / Highways

$651,631.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
5
Bidding Soon
64
All Active Projects
32
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2023

June 19, 2023

img_map_placeholder

Van Buskirk Rd, Ironwood, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.