EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 1, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Harrisburg, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Bull Creek Bridge No. 7 and No. 8 As a prospective bidder please note the following general Project information regarding Pre-Bid Information, Bidding Requirements, and Contract Conditions Bidding Requirements: This Project Requires Prequalification of Bidders, Including Subcontractors, as Specified in Section 102.01 of Commonwealth of Pennsylvania Department of Transportation Specifications (Publication 408/2020, Current Edition) on This Project. All Questions Must Be Submitted Through Ecms and if Needed Addenda Will Be Issued Electronically, Instructions to Bidders Will Be Provided in the Proposal Report Which Can Be Viewed Through Ecms. The anticipated Notice to Proceed for this project is March 27, 2023 and the project is to be completed by December 31, 2024 In accordance with the provisions of the "Pennsylvania Prevailing Wage Act" of August 15, 1961, P.L. 987, as Department of Labor and Industry, the prevailing minimum wage predetermination requirements as set forth in the Attachments apply to this Project. The County of Allegheny County hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, minority business enterprises / women business enterprises [MBE/WBE] will be afforded the full opportunity to submit bids on the grounds of race, sex, color or national origin in consideration for an award. It is a condition of the bidding process/contract that all responsive bidders/contractors shall follow the minority business enterprises/women's business enterprises [MBE/WBE] procedures set forth in the project manual/contract documents. The County Manager reserves the right to reject any and all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$2,344,777.00

Public - County

Paving, Site Work

121

9

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Metals, Common Work Results for Metals, Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Plaques
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Waterway Construction and Equipment, Waterway Scour Protection, Riprap Scour Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
100
Bidding Soon
1,414
All Active Projects
607
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2023

March 27, 2023

img_map_placeholder

Multiple Locations, Harrisburg, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bull Creek Bridge No. 7 and No. 8

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.