Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Center City, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
Description: Construction of Bituminous and Concrete Trail, includes Drainage, Concrete Curb and Gutter, and Signage . It is proposed to construct a new 2.8-mile-long bituminous surfaced trail along the east side of CSAH 30 from 410 th Street to CSAH 10. The trail is intended for non-automotive traffic including pedestrian, bicycle, ATV, and snowmobiles. 3.7 ACRE Clearing and Grubbing 750 S Y Remove Bituminous Pavement 8,200 C Y Excavation - Common (P) 17,300 C Y Common Embankment (CV) (P) 19,400 S Y Subgrade Preparation (P) 3,400 C Y Aggregate Base (CV) Class 5 (P) 2,900 TON Type SP 9.5 Wearing Course Mix (2,B) 500 TON Type SP 12.5 Non Wear Course Mix (3,C) 900 L F 12" - 18" CS Pipe Culvert 200 L F 12" - 24" RC Pipe Culvert 5 L F Construct Drainage Structure Des 48-4020 3,650 S F 6" Concrete Walk 1,010 L F Concrete Curb and Gutter Design B424 1,200 L F Wire Fence Design 42V-9322 1 L S Traffic Control 105 S F Sign 1 SYS Pedestrian Crosswalk Flasher System 7.8 ACRE Seeding 630 L F 4" Solid Line Paint
Award
Roads / Highways
$1,221,929.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2023
February 27, 2023
Multiple Locations, Center City, MN
Related To This Project
Center City, MN
Bid Date: Mar 14 2023
Center City, MN
Bid Date: Mar 14 2023
Center City, MN
Bid Date: May 23 2023
Center City, MN
Bid Date: Jun 15 2023
Center City, MN
--
Center City, MN
--
Center City, MN
--
Center City, MN
Bid Date: Feb 09 2021
Center City, MN
Bid Date: May 24 2022
Center City, MN
Bid Date: Mar 15 2022
Long Prairie, MN
Bid Date: Jan 31 2023
Eagan, MN
Bid Date: Mar 15 2023
Dodge Center, MN
Bid Date: Jan 26 2023
Bovey, MN
Bid Date: Feb 02 2023
Worthington, MN
Bid Date: Feb 08 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.