EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 9, 2023 at 7:00 PM

Updated January 26, 2024

Demolition, site work, new construction and renovation of a civil project in Antigo, Wisconsin. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Est. Completion Date: May 15, 2024 Pre-Qualification: Yes Pre-Bid Meeting Info: No prebid meeting. Description: Project involves construction of a 200,000 gallon elevated storage tank and foundation, decommissioning and demolition of a 150,000 gallon legged elevated storage tank, clear well roof hatches replacement, upgrading SCADA system, replacing MCC at Well Station No. 15, tank site work, restoration, and associated work. Additional Description: All Work is included in a single prime contract. Bid proposals from Minority Business Enterprises (MBE), Women Business Enterprises (WBE), and other Disadvantaged Businesses Enterprises (DBE) are encouraged. Prevailing wage rates for all trades and occupations involved in the Work shall be in accordance with the Prevailing Wage Rate Determination issued by the U.S. Department of Labor for this Project. Contract awarded under this advertisement for bids is expected to be funded in whole or part by a loan from the Safe Drinking Water Loan Program (SDWLP). This procurement will be subject to regulations contained in NR 166.12 Wisconsin Administrative Code and appropriate state statutes. Contract or contracts awarded under this advertisement for bids must demonstrate positive efforts to utilize DBEs, including MBEs and WBEs. This procurement will be subject to regulations contained in NR 166.12(4). Failure to comply may result in a sanction of up to 8% of the construction costs otherwise eligible for financial assistance being determined ineligible for financial assistance. DBEs, including MBEs and WBEs, who are prime bidders on the project must meet the same solicitation requirements unless the contract amount is in an amount equal to or greater than the applicable fair share objectives. The project will be funded in part by a loan from the SDWLP. Any contract or contracts awarded must comply with P.L. 113-76, Consolidated Appropriations Act, 2014 (Act) that includes an "American Iron and Steel (AIS) requirement in Section 436 that requires the use of iron and steel products that are produced in the United States for projects for the construction, alteration, maintenance, or repair of facilities funded by the SDWLP. Build America, Buy America (BABA) Act requirements will apply to this contract if applicable. Construction time is of the essence. Completion delays are subject to liquidated damages. The City of Antigo reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. A Bidder's qualification statement must be delivered to the City of Antigo at least 5 days before the Bid opening date. Bids shall be accompanied by a Bond or Certified Check payable to the City of Antigo equal to 5 percent of the Bid. If the successful Bidder fails to execute the Contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond may be forfeited to the City of Antigo as liquidated damages.

Bid Results

Water / Sewer

$2,913,100.00

Public - City

Demolition, New Construction, Renovation, Site Work

31

32

15

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Storm Water Pollution Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Maintenance Data, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment, Computers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
21
Bidding Soon
369
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2023

April 10, 2023

img_map_placeholder

Multiple Locations, Antigo, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.