EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 31, 2023 at 7:00 PM

Updated October 1, 2024

Site work, paving and new construction of a mixed-use development in Toledo, Ohio. Completed plans call for the construction of a 576-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The base bid portion of the project includes the installation of a grinder manhole system on the existing 8" gravity sewer exiting the facility. Alternate 1 consists of the construction of a 24' x 24' salt storage structure with tension fabric roof system and installing erosion control measures on the southwest corner of the vehicle loading area. Alternate 2 consists of the construction of a concrete parking. lot with 20 spaces. EDGE Participation Goal: 5.0% of contract Domestic steel use is required per ORC 153.011. Estimated Cost Base Bid: Sewage grinder system $385,000.00 Alternate 1 Salt Storage Building and Erosion Restoration........ $195,000.00 Alternate 2-Parking Area $130,000.00 20221620

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$335,000.00

Public - State/Provincial

New Construction, Paving, Site Work

20

12

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Musical Equipment, Bells
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Jib Cranes
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
121
Bidding Soon
1,389
All Active Projects
601
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 31, 2023

March 2, 2023

img_map_placeholder

2001 E Central Ave, Toledo, OH


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Ohio Department of Rehabilitation and Correction Toledo Correctional Institution - Bar Screen

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.