Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Austin, Texas. Completed plans call for the renovation of a municipal facility.
Q&A End Date:Jan 13, 2023 3:00:00 PM EST Building: 140 Upgrade the Intercom Headend System for Building #140. This building has [3] Areas with Headend rooms for the Security Detention Equipment, areas A -B -Central, which are controlled by 3 touchscreen stations (A-B-Central). Use the existing Headend Cabinets that are in place, existing wiring in place and field stations. Installation of an integration module for the Harding IC system to communicate with the Touchscreens and install new Audio PTT (push to talk) consoles at each location. This will include the new Harding 4 wire system that will connect to the existing field stations. The existing controls are SCS which will be programmed with the changes noted for each area. No door control changes at this time. The existing Rack space will be utilized for this project. o Intercom System Upgrade - A/ A Housing Area -1 Amp, 1 Page Amp, 68 Intercom stations [68 IC and 10 PG] o Intercom System Upgrade - B / B Housing Area - 1 Amp, 1 Paging Amp, and 52 Intercom Stations o Intercom System Upgrade - Central / Central Control Area - 2 Amp, 2 Paging Amp, and 66 Intercom Stations o Control System Integration / 3 Pod Control Station and 1 Central Station Building: 160 This building has [3] Areas with Headend rooms for the Security Detention Equipment, areas A -B - C, which are controlled by 4 touchscreen stations (A-B-C-Central). Use the existing Headend Cabinets that are in place. Installation of an integration module for the Harding IC system to communicate with the Touchscreens and install new Audio PTT (push to talk) consoles at each location. This will include the new Harding 4 wire system that will connect to the existing field stations. The existing controls are SCS which will be programmed with the changes noted for each area. No door control changes at this time. The existing Rack space will be utilized for this project. o Intercom System Upgrade - A / A Housing Area - 1 Amp, 1 Page Amp, 26 Intercom stations [J6 IC and 10 PG] o Upgrade - B / Upgrade - B Housing Area and Central Control - 2 Amp, 2 Paging Amp, and 66 Intercom Stations o Intercom System Upgrade - C / C Housing Area - 1 Amp, 1 Paging Amp, and 76 Intercom Stations o Control System Integration / 3 Pod Control Station and 1 Central Station Building: 400 This is to replace the headend equipment with Harding and convert the existing system from analog to digital. Configure and set up the system to work with the existing officer control system with the exclusion of the obsoleted PDA system. PDAs are not part of the new Harding integration. o Will install all new Harding intercom systems in the equipment rooms and run new wires to the control stations for new masters. o Reuse the existing wire to the intercoms and the intercoms to save the facility cost on all new intercoms. o Replace up to 10 of the most damaged end station intercoms while installing the new gear to help keep the facility in as best working condition as possible. o Programming group will reconfigure the TS control system to work with the new Harding hardware intercom system. o Onsite technicians will need to rework the equipment racks to fit the new system and remove the old
Post-Bid
Municipal
$110,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 2, 2023
March 6, 2023
Multiple Locations, Austin, TX
Related To This Project
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: Jan 31 2023
Austin, TX
--
Austin, TX
Bid Date: Sep 18 2023
Austin, TX
--
Austin, TX
Bid Date: Feb 23 2023
Austin, TX
Bid Date: Feb 06 2023
Austin, TX
Bid Date: Feb 23 2023
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Austin, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.