Renovation of an educational facility in Ewing, New Jersey. Completed plans call for the renovation of a 26,501-square-foot, two-story above grade educational facility.

As of 11/30/23, this project has not yet been awarded. A timeline for award has not yet been established. E0392-00 - ELMS Building Roof Replacement Marie Katzenbach School for the Deaf - 320 Sullivan Way - Trenton, Mercer County, NJ 08628 Project Location: Marie Katzenbach School for the Deaf Driving Directions To 320 Sullivan Way, Ewing, NJ 08628 From East: RT-18 S toward Pt Pleasant. Take exit 6B toward Garden State Parkway/RT-34/Pt Pleasant/I-195 onto RT-138 W (State Route 138). Keep left onto RT-138 W Continue on I-195 W (James J Howard Interstate Hwy). Continue on RT-29 N/RT-129 N toward I-195/RT-29/RT-129/Trenton. Turn right onto Sullivan Way (CR-579) Turn right. Destination will be on right From South: Head north on I-295 N towards Trenton Take exit 60 toward RT-29/Trenton onto RT-29 N/RT-129 N. Continue on RT-29 N toward Capitol Complex/Lambertville. Turn right onto Sullivan Way (CR-579) Destination will be on right From North: Take US Highway 1 (US-1 S) Take ramp onto I-295 N toward Hospital. Take exit 75 toward West Trenton onto CR-579 S (Bear Tavern Rd). Continue on Grand Ave (CR-579) Continue on Sullivan Way (CR-579) Turn left. Destination will be on left The Scope of this Project includes: A. Removal of existing roof systems throughout the multiple level roof including membranes, insulation, shingles, underlayments, copings, trims, flashings, etc., to the roof decks of the ELMS Building at the Marie Katzenbach School for the Deaf. B. The installation of a new 3-ply SBS modified bituminous built-up roofing system including flashings, and roof accessories, throughout all low-slope roof areas on the building. C. The installation of new rigid and tapered rigid polyisocyanurate insulation providing a minimum 1/4" per foot slope to drains at each roof area throughout the building in which new 3-ply SBS modified roofing is to be installed. The insulation is to be fastened to the existing decks to meet the requirements of FM 1-90 or greater as designated. D. Replacement of existing coping with new prefinished metal pre-engineered coping system where indicated on the Construction Drawings. E. The installation of new asphalt-fiberglass shingles, underlayment, and ice and water barrier throughout all high-slope roof areas on the building. F. The installation of new sawcut ridge vent slot, ridge vent, and ridge cap shingles, as well as roof vents and/or above-roof intake vent where indicated on the Construction Drawings. G. Replacement of joint sealers above the roof level. H. Replacement of roof sheathing as required and as directed by the Architect, on a unit price basis. I. Replacement of roof framing as required and as directed by the Architect, on a unit price basis. J. The raising of existing rooftop equipment curbs through the installation of additional nailers to accommodate increased insulation thickness. K. The construction duration for the Project is one hundred and twenty (120) calendar days from the issuance of the NTP by the State. Refer to Section 01 32 16 Construction Phasing and Progress Schedule for additional requirements. L. The Project work hours during the Summer, when school is not in session, are any time frame between 6:30 AM to 6:00 PM weekdays. If work is to occur when school is in session, the working hours will be restricted to between 8:00 AM and 4:00PM. No work will be permitted on weekends or State Holidays

Award

Educational

$1,365,000.00

Public - State/Provincial

Renovation

21

16

2

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
426
Active Projects
170
Bidding Soon
4,171
All Active Projects
1,847
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

January 8, 2024

img_map_placeholder

320 Sullivan Way, Ewing, NJ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.