BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 17, 2025 at 7:00 PM

Updated January 18, 2025

Site work and paving for a road / highway in Apple Valley, Minnesota. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

UPDATE:https://www.co.dakota.mn.us/Government/BudgetFinance/2025/Documents/2025-2029CapitalImprovementProgram.pdf CSAH 33 (Diamond Path) from 140th Street/Connemara Trail to CSAH 31 (Pilot Knob Road) in Apple Valley and Rosemount to evaluate roadway operations, identify safety improvements, and plan for land use changes/increased traffic levels. Project is in Dakota County - Capital Projects Management capital budget fy 2025-2029 CIP 103 ______________________________________________________________________________________________________ RESOURCES: Preliminary Engineering/Design - Consultant REPLACEMENT/MODERNIZATION: Roadway Reconstruction CSAH 33 (Diamond Path) Preliminary Engineering from 140th Street/Connemara Trail to CSAH 31 (Pilot Knob Rd) in Apple Valley and Rosemount to evaluate roadway operations, identify safety improvements and plan for land use changes/increased traffic levels. Preliminary Engineering phase in 2023 will make recommendations for a preferred alternative. Final design is planned for 2024, ROW acquisition in 2025, and construction in 2026. The project is included in the Dakota County 2023-2027 Capital Improvement Plan (CIP). As of January 11, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$12,800,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
0
Bidding Soon
790
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 3, 2029

Project location map

Diamond Path W, Apple Valley, MN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.