BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 28, 2026 at 7:00 PM

Updated January 29, 2026

Site work for a transportation facility in Chicago, Illinois. Working plans call for site work for a transportation facility.

*As of January 28, 2026, this Design-Build project is currenty in the design phase of the project, which is about 1 year underway. Construction is slated to begin slowly in Q2 of 2026. CTA Red Line Extension - Mainline Design Build. The Red Line Extension (RLE) project by the Chicago Transit Authority (CTA) is a significant infrastructure initiative aimed at extending the Red Line from the existing terminal at 95th/Dan Ryan to 130th Street. This 5.6-mile extension will include four new fully accessible stations near 103rd Street, 111th Street, Michigan Avenue, and 130th Street.

Pre-Construction/Negotiated

Transportation Terminals

$3,600,000,000.00

Public - City

Site Work

16

25

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
697
Active Projects
398
Bidding Soon
3,649
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

April 6, 2026

Project location map

To Be Determined, Chicago, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.