EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2024 at 8:00 PM

Updated June 11, 2024

Site work for a transportation facility in Chicago, Illinois. Completed plans call for site work for a transportation facility.

https://www.colonialsurety.com/good-newsbad-newsmore-work-ahead-blog/ What infrastructure woes-and investments-mean for builders, of course, is that there is plenty of work to do. Indeed, the U.S. DOT has continuously rolled out new rounds of funds from the IIJA since 2021. This spring, for example, applications are being accepted under both the Multimodal Project Discretionary Grant Program and Consolidated Rail Infrastructure and Safety Improvements Program. Meanwhile, the Federal Highway Administration is funding $1.2 billion of projects aimed at reducing air pollution and greenhouse gas emissions as per the Inflation Reduction Act's "Low Carbon Transportation Materials Program." Looking further ahead, pending approval of the next wave of federal investment, ambitious new projects are already taking shape at planning tables across the country. _____________ CTA Red Line Extension - Mainline Design Build. As of May 2024, a timeline for construction has not been determined. Preparatory work is expected to begin in 2024 for an anticipated commencement in 2025.

Post-Bid

Transportation Terminals

$3,600,000,000.00

Public - City

Site Work

16

25

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Commissioning
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Escalators and Moving Walks
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
118
Bidding Soon
2,293
All Active Projects
970
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2024

October 1, 2024

img_map_placeholder

To Be Determined, Chicago, IL


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Red Line Extension (RLE) - Mainline Design-Build Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.