BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Bell Gardens, California. Completed plans call for the renovation of a educational facility.

Roof Restore/Repairs/Replacement at Bell Gardens High School This project is sublect to the enforcement of the DLSE PWR Monitoring/Enforcement by the Department of Industrial Relations (DIR), Division of Labor Standards Enforcement Pursuant to Labor Code 1771. Required Licenses: A, B or C39. Please be advised that this and all public works projects are subject to SB 854 DIR Contractor Registration DLSE Prevailing Wage Rate Enforcement & Monitoring. As of March 1, 2015, bids cannot be accepted nor any contract or subcontract entered into without proof that the contractor and all subcontractors are registered, Scope- The scope of work outlined in these documents is a summary of the work to be performed and executed by the contractor. For complete details of the scope of work refer to all parts of the construction/bid documents including the following, plans, specifications and all codes and standards referred to in the bid documents and governed by local standards. In short, the work will comprise, but is not limited to: Replace/Restore/Repair the roofs, rooftop first responders labeling, and rain gutter/down spouts replacement per Tremco's specs and remove and replace all fascia board at Bell Gardens High School. The terms of this Hazardous Material provision shall survive the completion of the work and/or any termination of this contract. If the environmental spec or survey for a building or area is not provided, the building or area is to be assume positive of hazardous materials. Critical containment to be installed inside classrooms/offices or buildings if the roof is being replaced or repaired. Abatement work to be done on non-school days, weekends or after school hours. All new fascia board to be premium KD Hem-Fir, primed and two coats of finish paint using Dunn Edwards product or equal to. Start of Construction: June 10, 2024 (Monday) A total of 56 consecutive calendar days of contract period

Bid Results

Educational

$3,380,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
101
Bidding Soon
2,251
All Active Projects
998
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

June 10, 2024

img_map_placeholder

6119 Agra St, Bell Gardens, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.