BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in Vallejo, California. Contact the soliciting agency for additional information.

Project Type RFQual (Request for Qualification) Response Types Line Items Cost File Response File General Attachment Type of Award Lump Sum Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A No Please provide brief responses to the following items. An example survey report showing your work product may be requested as a follow-up. 1 - Is your firm a registered DBE, SBE, MBE, or WBE If yes, please indicate which one and confirm your registration is current. 2 - Does your firm hold an existing Master Services Agreement (MSA) with Stantec If so, please provide the MSA number and expirations date. 3 - Please describe your policy on delay of work and indicate the hourly standby time. 4 - Provide resumes of key project personnel. Project managers responsible for directing and leading surveys should be certified through the State of California, Division of Occupational Safety and Health (DOSH) as Certified Asbestos Consultants (CACs) and through the State of California, Department of Public Health (CDPH) as Certified Lead Inspector Assessors. 5 - Field inspectors should be either DOSH Certified Site Surveillance Technicians and/or CACs and Certified Lead Inspector Assessors and/or Certified Lead Sampling Technicians. Copies of these certifications may be requested. 6 - Please verify and list additional health and safety training and be prepared to provide medical clearance and respirator fit test documentation for your field staff. 7 - Please describe your experience and summarize your approach to conducting ACM, LBP, PCBs in building materials and RBM surveys at commercial/industrial properties. Also describe your experience with conducting PCB sampling in accordance with BASMAA guidelines for Managing PCB Priority Building Materials During Demolition. 8 - Supplemental reporting services may be required. Please describe your experience with preparing project specifications for abatement and submitting notification through: a. The Asbestos Renovation and Demolition Notification through BAAQMD and/or b. California Department of Public Health (CDPH) form 8552 and/or c. PCBs in priority building materials abatement plans with the US EPA Region 9. 9 - Please describe any additional value-added services or unique qualifications that Stantec should consider in evaluating your cost estimate and qualifications. Requests for information should be submitted vie email to neil.doran@stantec.com no later than 5 PM on January 27, 2023, and responses will be posted on the City's bid portal website by close of business on January 31, 2023. The Method of Contractor Selection has not been determined at this Time.

Conceptual

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
90
Bidding Soon
1,818
All Active Projects
772
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

img_map_placeholder

Multiple Locations, Vallejo, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.