BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Union City, Tennessee. Completed plans call for the renovation of a water / sewer project.

Sewer Pump Station, Sewer Force Main, Electrical and Controls, Electrical Installation/Construction, Fittings and Valves, Sewer and Water Construction, Water and Wastewater Facilities, Water Resources Infrastructure The work is in one Contract and is generally described as follows: o Replacement of two mechanically cleaned bar screens and compactors. o Replacement of two existing screw pumps with submersible pumps with VFD drives, controls, FRP electrical enclosure, and associated piping. o And all related electrical and appurtenances. The allotted time for construction for this contract is one hundred eighty (180) calendar days. Liquidated damages for non-completion are $500 per calendar day. Each bidder shall be properly licensed and abide by the provisions of TCA 62-6-119 including part (b) which states in part: "(b) The person or entity involved in the preparation of the invitation to bid or comparable bid documents, including any electronic bid documents, shall direct that the following information be written upon the bid envelope or provided within the electronic bid document: (1) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the prime contract; (2) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the masonry contract where the total cost of the materials and labor for the masonry portion of the construction project exceeds one hundred thousand dollars ($100,000); (3) The name, license number, expiration date thereof, and license classification of the contractor applying to bid for the electrical, plumbing, heating, ventilation, or air conditioning contracts except when such contractor's portion of the construction project is less than twenty-five thousand dollars ($25,000); (4) For each vertical closed loop geothermal heating and cooling project, the company name, Department of Environment and Conservation license number, classification (G, L or G,L) and the expiration date, except when the geothermal portion of the construction project is in an amount less than twenty-five thousand dollars ($25,000); (5) Prime contractor bidders who are to perform the masonry portion of the construction project which exceeds one hundred thousand dollars ($100,000), materials and labor, the electrical, plumbing, heating, ventilation or air conditioning or the geothermal heating and cooling must be so designated; and (6) Only one (1) contractor in each of the classifications listed above shall be written on the bid envelope or provided within the electronic bid document." The Owner reserves the right to reject any or all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Union City does not discriminate based on race, color or national origin in federal or state sponsored program, pursuant to Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d). Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, Segregated Facility, Section 109 and E.O. 11246. In compliance with TCA 12-4-126(a) and (b), the ENGINEER will not issue addenda less than forty-eight (48) hours before the bid opening date and time. Any questions concerning the bid documents shall be received by the ENGINEER before ninety-six (96) hours prior to the bid opening date and time. The Contractor shall comply with the requirements of Tennessee Code Annotated, Section 50-9-113 and Title 50, Chapter 9 of the Tennessee Code while performing this contract The Contractor shall comply with the requirements of Tennessee Code Annotated Title 12, Chapter 4, Part 1 of the Tennessee Code while performing this contract. By submission of this bid, each bidder and each person signing on behalf of any bidder certifies, and in the case of a joint bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each bidder is not on the list created pursuant to Tennessee Code Annotated Title 12, Paragraph 12-12-106.

Bid Results

Water / Sewer

$1,685,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
16
Bidding Soon
288
All Active Projects
119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

April 3, 2023

img_map_placeholder

To Be Determined, Union City, TN

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.