BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Point Comfort, Texas. Completed plans call for site work for a water / sewer project.

This Project includes the following Work: The Owner is proceeding with construction of the East Delivery System (EDS) Waterline Relocation Project (The Project). The project is predicated by TxDOT's need to widen FM 1593 adjacent to the Formosa Plastics Plant North of Point Comfort. The Project will include approximately 3,240 LF of 57-inch waterline relocation and approximately 8,919 LF of 36-inch waterline relocation, with applicable removal and abandonment of existing water lines shown in the Drawings. The Project will have the following facilities: 1. The 57-inch waterline relocation will begin approximately 3.3 miles North of the intersection of FM 1593 and Highway 35 and re-connect to the existing 57-inch waterline 3,000 ft South. 2. The 36-inch waterline relocation will begin approximately 2.2 miles North of the intersection of FM 1593 and Highway 35 and connect to the existing 36-inch adjacent to the Pond C meter vault site, 10,000 ft South. 3. The construction method for most of the 57-inch and 36-inch waterlines will be open cut. The alignment will require trenchless crossings below paved access roads leading to the Formosa Plastics Plant. 4. Includes 4 valve vaults for proposed butterfly valves and gate valves along the proposed waterline alignments. 5. Includes installation of two 36-inch size-on-size tapping sleeves and valves, 36-inch line stops with bypasses, and 57-inch line stops with bypasses. Offerors should take note that the ductile iron pipe, fittings, and valves were procured under a separate contract and will be assigned to the successful offeror as part of this contract. Please direct all questions related to the design of this Project to the Q&A Section. The deadline to ask questions is 3/13/2023 5:00 PM CST

Bid Results

Water / Sewer

$12,841,144.00

Public - County

Site Work

60

29

22

4

Subscribe For Documents

91 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
31
Bidding Soon
1,298
All Active Projects
501
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 16, 2023

March 28, 2023

img_map_placeholder

TX-35 & FM1593, Point Comfort, TX


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.