BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 20, 2024 at 8:00 PM

Updated April 21, 2024

Renovation of a fire / police facility in McKinney, Texas. Completed plans call for the renovation of a fire / police facility.

SCOPE OF WORK INCLUDES all materials, labor, equipment and services to produce or be incorporated in such construction. Contract will be a general contract for the construction of the Adult Detention Smoke-Heat Detector Replacement. The project is to complete the installation of a modification to the existing EST-3 addressable automatic fire detection and emergency voice/alarm communication system in the Sherrif's Office and throughout the Collin County Detention Center located at 4300 Community Avenue in McKinney Texas to monitor and control the existingsprinkler system. System is located in CC50 911 Dispatch Center. The construction is also to upgrade the existing IRC-3 existing initiating appliances within the Project to EST-3 initiating appliances as noted on the Contract Drawings and described within the project specifications. Reference Specification 283100 and 283101. Payment for the contract work shall be made pursuant to the terms of the Contract Documents. The opinion of probable construction cost for this contract is $ 1,300,000.00. Question Deadline Mar 06, 2024 at 5:00 PM

Bid Results

Fire / Police

$368,317.00

Public - County

Renovation

64

11

7

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
380
Active Projects
134
Bidding Soon
3,987
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

June 3, 2024

Project location map

4300 Community Ave, McKinney, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.