EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 15, 2023 at 7:00 PM

Updated January 26, 2024

Site work, paving and new construction of a mixed-use development in Picayune, Mississippi. Completed plans call for the construction of a educational facility; for site work for a educational facility; sidewalk / parking lot; sidewalk / parking lot; for paving for a sidewalk / parking lot; pre-engineered storage facility; pre-engineered storage facility; water / sewer project; and water / sewer project.

**As of February 15, 2023 this project has not yet been awarded. The project is expected to be awarded on February 17, 2023.** 22005 Picayune Multipurpose Westside and Southside. 1. Project Locations : a. West Side Elementary : 111 Kirkwood Street, Picayune, MS 39466. b. South Side Lower Elementary : 400 S Beech Street, Picayune, MS 39466. This project includes the construction of two (2) covered slabs for the purposes of outdoor education. This includes: pouring slab, pouring new sidewalk, demoing existing fence as necessary to provide a new vehicle gate, providing a new concrete drive, rerouting existing underground drainage, tying new downspouts into underground drainage, constructing a pre-engineered metal building structure, installing new metal roofing and metal wall panels, installing new gutters and downspouts, providing CMU wrapping for PEMB structure, installing new lighting, and installing new outlets at each column wrap. 2. This project is funded by ESSER (Elementary and Secondary School Emergency Relief) Federal Funding. Questions regarding website registration and online orders please contact Plan House Printing, 607 W. Main Street Tupelo MS 38804, (662) 407-0193. 2. Bid Documents will only be made available to plan holders as entire documents. Partial sets will not be issued. In addition, the envelope shall list the bidders Company name, Company address and all applicable state and local license and registration numbers of the bidder. Envelopes not so marked are submitted at the risk of the bidder as the Owner and Architect assume no responsibility for the premature opening of any bid envelope by any employee of the Owner or Architect. Owner will consider bids prepared in compliance with the Instructions to Bidders issued by Owner, and delivered as follows: 1. In addition, Electronic bids may be submitted through the website www.dalebaileyplans. com. Electronic bids are not required by the Picayune School District but offered as another means to submit a bid. Single stipulated sum bids will be received for all work required by the contract documents in accordance with the Instructions to Bidders. Picayune School District, 706 Goodyear Blvd., Picayune, MS 39466. C. Proposals shall be submitted in duplicate only upon the blank proposal forms provided with the specifications and must be accompanied by Proposal Security in the form of a Certified Check or acceptable Bid Bond in the amount equal to at least five percent (5%) of the Base Bid: such security to be forfeited as liquidated damages, not penalty, by any bidder who fails to carry out the terms of the proposal, execute a contract and post-Performance and Payment Bonds in the form and amount within the time specified. The Bid Bond, if used, shall be payable to the Owner. D. Bids will be thereafter publicly opened and read aloud. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 90 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. B. The owner reserves the right to postpone action and final decision for a period of up to ninety (90) days. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder. This project includes the construction of two (2) covered slabs for the purposes of outdoor education. This includes: pouring slab, pouring new sidewalk, demoing existing fence as necessary to provide a new vehicle gate, providing a new concrete drive, rerouting existing underground drainage, tying new downspouts into underground drainage, constructing a pre-engineered metal building structure, installing new metal roofing and metal wall panels, installing new gutters and downspouts, providing CMU wrapping for PEMB structure, installing new lighting, and installing new outlets at each column wrap. and other Work indicated in the Contract Documents.

Bid Results

Educational

$1,127,375.00

Public - City

New Construction, Paving, Site Work

32

29

6

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Contingency Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, References, Definitions, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Masonry Grouting, Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Culverts, Pipe Culverts, Subdrainage
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
36
Bidding Soon
478
All Active Projects
207
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 9, 2023

March 13, 2023

img_map_placeholder

Multiple Locations, Picayune, MS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.