BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Manchester, Massachusetts. Completed plans call for site work for a playground / park / athletic field.

The project includes the removal of the existing synthetic turf and the installation of the turf replacements Note: Bidders must register with Westongraphics in order to receive notification of addenda. The Awarding Authority will not be responsible for notifying bidders that are not registered. Deposits may be paid by credit card, certified or cashier's check. This deposit will be refunded for up to two sets for general bidders upon return of the sets in good condition within thirty days of the bid opening. Otherwise plan deposit shall become the property of the Awarding Authority. Additional sets may be purchased for $50.00. Bidders requesting Contract Documents to be mailed shall include a separate check for $40.00 per set for UPS Ground (or $65.00 per set for UPS overnight), payable to Westongraphics, to cover mail handling costs. Each bid shall be accompanied by a bid guaranty in the form of a bid bond, issued by a responsible surety company licensed to do business in Massachusetts, or a certified check, or a treasurer's or cashier's check issued by a responsible bank or trust company and made payable to the Owner, in the amount of 5% of the bid price. A performance bond in an amount equal to 100% of the total amount of the contract price with a surety company qualified to do business in the Commonwealth of Massachusetts, will be required for the faithful performance of the contract, as well as a payment bond in an amount equal to 100% of the total contract price. All bids for this project are subject to applicable public bidding laws of Massachusetts, including G.L. c.30, 39M, as amended All questions must be submitted in writing to the following at least 72 business hours before the bid opening: Ms. Kathleen D. Hervol Title: Project Manager Email: kdh@gainc.com Gale Associates, Inc. Copy: Mr. Ryan Thackeray Staff Engineer Email: rdt@gainc.com Gale Associates, Inc.

Bid Results

Playgrounds / Parks / Athletic Fields

$1,352,385.00

Public - City

Site Work

18

10

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
134
Bidding Soon
2,443
All Active Projects
1,002
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2023

June 15, 2023

img_map_placeholder

Multiple Locations, Manchester, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.