Site work and paving for a mixed-use development in Durant, Oklahoma. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of March 9, 2023, project was awarded to J&L Paving LLC, awarded amount is $366,485.96. Durant Multi Sports Complex Parking Lot Resealing - Approximately 318,712 SF of parking lot and roadway for resealing with the scope of work as follows: - Resealing, repairing broken areas, and repainting/restriping the parking lot lines. - Grade to drain. - Installation of 4"- 6" of Asphalt Concrete Pavement. - All construction to comply with the City of Durant's Code of Ordinance (97.045) and (97.046). The work shall be completed within ninety (90) calendar days after the authorized starting date. Liquidated damages are established at $1,200.00 per day. The bid shall be accompanied by a certified check, cashier's check or bid bond equal to five percent (5%) of the bid, which shall be deposited with the awarding public agency as a guaranty. The following bonds will be required from the awarded Contractor: Performance bond to the Full Amount of the Contract Price. Statutory Public Works Bond for payment of all labor and materials used in the construction of such improvements in the Full Amount of the Contract Price. One (1) year Maintenance Bond to the Full Amount of the Contract Price. Bidders will be responsible for estimating all quantities required for completion of the scope of work and present a lump sum amount in the bid schedule by examination of the sites. After bids have been submitted, the bidder shall not assert that there was a misunderstanding concerning the quantities of work. Information obtained from an officer, agent, or employee of the City of Durant or any other person shall not affect the risks or obligations assumed by the contractor or relieve him from fulfilling any of the conditions or the contract. The City of Durant reserves the right to reject any and all bids and to waive informalities in any bid.

Award

Sidewalks / Parking Lot

$366,486.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
85
Bidding Soon
2,078
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2023

March 8, 2023

Project location map

1920 OK-78, Durant, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.