BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition and site work for a medical facility in San Francisco, California. Completed plans call for the demolition of a medical facility; and for site work for a medical facility.

University reserves the right to accept late submissions and to request, receive, and evaluate supplemental information after the above time and date at its sole determination. Swinerton Builders has entered into a CM-at-Risk contract with the University of California, San Francisco Medical Center for this project. Swinerton has determined that the shoring trades who submit bids on this project must be prequalified and will be conducting the prequalification process. Prequalified bidders will be required to have the following California contractor's license Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wage at the location of the work. The UCSF Mount Zion site includes seven (7) above grade buildings, one (1) below grade building, underground foundations of a ninth building that was demolished and a service yard at the center of the campus. It is bounded by Divisadero, Sutter, Scott and Post Streets. The Site Preparation scope includes demolition of three (3) of the existing buildings of which one shares a wall with an HCAI-1 building that remains. The Bulk O2, Trash Compactor and EH&S Staging areas will need to be relocated within the existing Service Yard. After completion of the Site Preparation work, and under a separate contract not included in this project, construction for an Outpatient Center (OPC) with approximately 220,000 sf of building that includes one level below grade and up to eight levels above grade will commence. The entire OPC will be an HCAI-3 building.

Award

Medical

$20,000,000.00

Public - State/Provincial

Demolition, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
81
Bidding Soon
1,792
All Active Projects
745
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

March 1, 2024

img_map_placeholder

Multiple Locations, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.